DirecTV Advanced Installation Meter User Manual

DirecTV Advanced Installation Meter User Manual

Advanced installation meter

Advertisement

Advanced Installation Meter
User's Manual
© 2010 Rev B

Advertisement

Table of Contents
loading

Summary of Contents for DirecTV Advanced Installation Meter

  • Page 1 Advanced Installation Meter User’s Manual © 2010 Rev B...
  • Page 2: Table Of Contents

    Contents Warranty Return Policy Getting Started Introduction Using This Manual Overview Conventions Getting To Know Your Meter Features Accessories Display Buttons Navigation HOME Screen Powering Your Meter Power-On Standby Mode Restart Power-Off Power Management Battery Charging Battery Replacement...
  • Page 3 AIM User’s Manual Getting Technical Support Safety Instructions Technical Specifications Spare Parts List Setting Up the Meter Entering Registration Information Changing Volume Setting Changing the Display Contrast or Brightness Changing Time and Date Settings Changing Automatic Timer Settings Setting Up a Job Starting a Job Modifying the Setup for a Job Notes...
  • Page 4 AIM User’s Manual Installing an ODU Aligning the ODU Task A. Installation Setup Task B. Coarse Azimuth Adjustment Task C. Coarse Elevation Adjustment Task D. Tilt Adjustment (95°, 3-LNB, Slimline-5, and Slimline-5S (SWiM) ODUs Only) Task E. Fine Elevation Adjustment (Slimline ODUs Only) Task F.
  • Page 5 AIM User’s Manual Managing Records Understanding Records Account Records Setup Records User Records Test Records Data Records Viewing Records Deleting Records Transferring Records Updating the Meter Glossary Index...
  • Page 6: Warranty

    AIM User’s Manual Warranty Trilithic, Inc. warrants that each part of this product will be free from defects in materials and workmanship, under normal use, operating conditions and service, for a period of fifteen (15) months from date of shipment. The obligation of Trilithic, Inc. under this warranty shall be limited, at the sole option of Trilithic, Inc., to replacing the product or repairing any defective part.
  • Page 7: Return Policy

    AIM User’s Manual Return Policy Before returning a product for service, please call Trilithic Customer Service at 888-895-7630 for an RMA number. During this call, a Product Service Representative will schedule your unit for service, note the nature of the problem, and provide instructions for the return of your product.
  • Page 8: Getting Started

    Getting Started Introduction Congratulations on your new Advanced Installation Meter (AIM)! The AIM was developed in collaboration with DIRECTV to provide customized features for installing and troubleshooting DIRECTV satellite receiver systems. The AIM is a rugged meter suitable for both indoor and outdoor use. When fully charged, the AIM can be used to install satellite receiver systems in approximately six single-family homes on a single charge.
  • Page 9: Using This Manual

    1 Getting Started AIM User’s Manual Using This Manual Overview Read this manual completely before using your AIM. Also, retain this manual for future reference. For information to help you get started using your AIM, see the sections below: Getting to Know Your Meter, starting on page 5. This section provides an overview of the AIM, including information about the meter and its accessories, its display and buttons, and how to navigate through the screens on the meter.
  • Page 10 1 Getting Started AIM User’s Manual Instructions for using the AIM’s features are provided in the following chapters: Chapter 2: Setting Up the Meter, starting on page 21. Before you use your AIM, you need to enter registration information and confirm the meter’s settings. This chapter provides instructions for entering registration information, as well as setting the meter’s volume, display contrast and brightness, time limits for power-saving features, and date and time.
  • Page 11: Conventions

    AIM User’s Manual Chapter 6: Performing Other Network Tests, starting on page 50. If there is a problem with a DIRECTV installation, you can run network tests to help you troubleshoot the problem. This chapter provides instructions for performing tests including the In-line test, Satellite Tune test, SWiM LF Power test, Cable Resistance test, and Transponder Survey.
  • Page 12: Getting To Know Your Meter

    1 Getting Started AIM User’s Manual Getting To Know Your Meter Figure 1 Front View Features Your AIM has the following features: Connectors 1 IRD F connector 2 ODU F connector 3 Type A USB connector (Standard) 4 Type B USB connector (Mini) 5 Power input Buttons 6 Softkeys...
  • Page 13 1 Getting Started AIM User’s Manual 12 Speaker Figure 2 Back View 13 Meter serial number...
  • Page 14: Accessories

    1 Getting Started AIM User’s Manual Accessories Figure 3 Meter Accessories Your AIM comes with the following accessories. If any of the following items are missing, contact your supplier. 1 Carrying case (with shoulder strap and detachable storage pocket) 2 100 – 240 VAC power adapter 3 12 VDC vehicle power adapter 4 25 Ω...
  • Page 15: Display

    1 Getting Started AIM User’s Manual Display The AIM has a large LCD display with a backlight for easy readability. Each screen that appears on the display has the following: Figure 4 Meter Display 1 Title bar: Indicates the screen that is displayed. 2 Battery icon: Indicates the power level of the battery.
  • Page 16: Navigation

    1 Getting Started AIM User’s Manual Navigation Keep in mind the following guidelines when using the meter buttons to navigate through the AIM’s features: To select a softkey option, press the button below that option. To highlight an option in a list, do one of the following: –...
  • Page 17: Home Screen

    1 Getting Started AIM User’s Manual HOME Screen The HOME screen lets you access the AIM’s main features. You can press the HOME button at any time to access the HOME screen. The HOME screen provides four softkeys that correspond to each of the main features of the AIM: SETUP: Lets you set up the information for a job.
  • Page 18: Standby Mode

    1 Getting Started AIM User’s Manual Standby Mode You can place your AIM in a power-saving state called Standby mode. Standby mode lets you turn off the AIM display and other features to extend the charge of the battery. You can quickly exit Standby mode and resume working on the screen where you left off.
  • Page 19: Power Management

    1 Getting Started AIM User’s Manual Power Management Your AIM is powered by an 8-cell 9.6 V 3.8 AH NiMH battery pack. The battery supplies power to the meter, as well as to the LNB and SWiM during installation of an ODU.
  • Page 20: Battery Charging

    1 Getting Started AIM User’s Manual Battery Charging You can charge the AIM’s battery from a power outlet using the AC power adapter provided with the meter. You also can charge the AIM in your vehicle while the vehicle is running using the vehicle power adapter. The AIM can be charged while it is powered off or while it is powered on, which allows you to use the AIM while it is charging.
  • Page 21: Battery Replacement

    1 Getting Started AIM User’s Manual Battery Replacement If necessary, you can replace the AIM’s battery. To obtain a new battery, contact Trilithic. See “Spare Parts List” on page 20. You also can return your AIM to Trilithic Customer Service and request that the battery be replaced.
  • Page 22 1 Getting Started AIM User’s Manual 2 Carefully separate the front housing and the back housing, and place the unit on a flat work surface. Figure 6 Removing the Battery Cover 3 Using the Phillips-head screwdriver, remove the 4 screws on the battery cover and remove the cover.
  • Page 23 1 Getting Started AIM User’s Manual To replace the battery: 1 Place the new battery in the compartment in the AIM back housing with the battery wires routed as shown in Figure 7. 2 Reconnect the battery connector to the circuit board. 3 Replace the battery cover and 4 screws.
  • Page 24: Getting Technical Support

    When you need instructions for using the AIM, your first resource for help is this manual. If you cannot find the information you need, you can: Go to the DIRECTV Satellite Installer website or other websites provided by DIRECTV. DIRECTV websites contain product specifications and information, tips, release information, marketing information, Frequently Asked Questions (FAQs), bulletins and other technical information.
  • Page 25: Safety Instructions

    1 Getting Started AIM User’s Manual Safety Instructions When operating and maintaining the AIM meter, basic safety precautions should always be followed to reduce the risk of electric shock and injury to persons, including the following: Warning! The AIM meter is capable of generating 21 volts. Never connect the AIM to devices that may be damaged by application of AC or DC voltage.
  • Page 26: Technical Specifications

    1 Getting Started AIM User’s Manual Technical Specifications Frequency Range 250 MHz to 2150 MHz Signal Level Range -10 dbm to -69 dbm RF Input Connector Replaceable F-Type (2) Input Impedance 75 ohm Measurements Refer to the instructions in this manual. LNB Power Supply 13 volts / 18 volts SWiM Power Supply...
  • Page 27: Spare Parts List

    1 Getting Started AIM User’s Manual Spare Parts List You can order the following parts for the AIM. Contact Trilithic at 888-895-7630 and request the corresponding part number below: 100 – 240 VAC power adapter: 0610177000 12 VDC vehicle power adapter: 2072097000 Battery pack: 0090056000 25 Ω...
  • Page 28: Setting Up The Meter

    Setting Up the Meter Before you use your AIM, you should enter registration information, including your ID, name, phone number, and company (see page 22). You also should review the meter’s settings. You can change the following settings: volume (see page 24) Tip: To quickly adjust the setting for display display contrast and brightness (see page 25) contrast, display brightness, or volume, you can...
  • Page 29: Entering Registration Information

    2 Setting Up the Meter AIM User’s Manual Entering Registration Information Before you use your AIM, you should enter registration information in the meter, including your name, ID, phone number, and company. To enter registration information: 1 Press CONFIG to go to the CONFIGURATION screen. 2 Use to highlight Settings and press SELECT to go to the SETTINGS screen.
  • Page 30 2 Setting Up the Meter AIM User’s Manual 5 Use the alphanumeric keypad to enter the ID, name, phone number or company. 6 Press ENTER to save and return to the REGISTRATION screen. 7 Repeat Step 4 through Step 6 for each item on the REGISTRATION screen. 8 When you have finished entering registration information, press DONE to return to the SETTINGS screen.
  • Page 31: Changing Volume Setting

    2 Setting Up the Meter AIM User’s Manual Changing Volume Setting Tip: You can temporarily turn on or turn off the meter sound by pressing MUTE. You also can You can change the volume setting for your AIM. press Fn to quickly adjust the volume setting. To change the volume settings: 1 Press CONFIG to go to the CONFIGURATION screen.
  • Page 32: Changing The Display Contrast Or Brightness

    2 Setting Up the Meter AIM User’s Manual Changing the Display Contrast or Brightness Tip: You can press Fn to quickly adjust the display contrast or display brightness settings. You can change the display contrast and display brightness settings for your AIM. To change the display contrast or brightness: 1 Press CONFIG to go to the CONFIGURATION screen.
  • Page 33: Changing Time And Date Settings

    2 Setting Up the Meter AIM User’s Manual Changing Time and Date Settings You can change the time and date settings of your AIM, including the format for the time and date. To change the time and date settings: 1 Press CONFIG to go to the CONFIGURATION screen. 2 Use to highlight Settings and press SELECT to go to the SETTINGS screen, which shows the current settings for the meter.
  • Page 34 2 Setting Up the Meter AIM User’s Manual 4 Use to highlight the item you want to change (Time Format, Date Format, Time, or Date). Then press SELECT to go to the entry screen. 5 Use to highlight the desired format setting, or use the numeric keypad to enter the time or date.
  • Page 35: Changing Automatic Timer Settings

    2 Setting Up the Meter AIM User’s Manual Changing Automatic Timer Settings You can change the automatic timer settings for your AIM, including: Backlight Timer: If no buttons have been pressed on the AIM after the specified time limit, the backlight on the display turns off. The backlight automatically turns back on when you press any button on the meter.
  • Page 36 2 Setting Up the Meter AIM User’s Manual 3 Use to highlight the automatic timer setting you want to change: – Highlight Backlight Timer to set the time limit for automatically turning off the display backlight after no buttons have been pressed. –...
  • Page 37: Setting Up A Job

    Setting Up a Job Before you perform tasks for an installation using the AIM, you need to set up the information for the job. Setup tasks include: entering the account number (see page 31) entering notes (optional; see page 33) selecting the ODU type (see page 34) selecting the switch type (see page 35) entering the zip code (see page 36).
  • Page 38: Starting A Job

    3 Setting Up a Job AIM User’s Manual Starting a Job To start a job, enter the account number for the installation. The AIM stores information about the tasks you perform for the installation in records associated with the account number. For the first job at an installation, you also set the ODU type, switch type, zip code, and notes either by accepting the default settings (based on the previous job), or by changing the default settings.
  • Page 39 3 Setting Up a Job AIM User’s Manual The MODIFY JOB SETUP screen reappears, showing the account number you entered and the default settings for: Tip: The account number can be up to 22 digits. – ODU Type – Notes –...
  • Page 40: Modifying The Setup For A Job

    3 Setting Up a Job AIM User’s Manual Modifying the Setup for a Job You can change the ODU type, switch type, and zip code settings for a new job or the current job from the MODIFY JOB SETUP screen. You also can add notes for the job to include key information about the job, such as the specific room of the installation.
  • Page 41: Odu Type

    3 Setting Up a Job AIM User’s Manual ODU Type To change the ODU type for a job: 1 On the MODIFY JOB SETUP screen, use to highlight ODU Type and press SELECT to go to the ODU TYPE screen. 2 Use to highlight the ODU type for the job.
  • Page 42: Switch Type

    3 Setting Up a Job AIM User’s Manual Switch Type To change the switch type for a job: 1 On the MODIFY JOB SETUP screen, use to highlight Switch Type and press SELECT to go to the SWITCH TYPE screen. 2 Use to highlight the type of switch for the job and press SELECT.
  • Page 43: Zip Code

    3 Setting Up a Job AIM User’s Manual Zip Code To change the zip code for a job: 1 On the MODIFY JOB SETUP screen, use to highlight Zip Code and press SELECT to go to the ZIP CODE screen. 2 Using the numeric keypad, enter the zip code for the job.
  • Page 44: Installing An Odu

    The AIM guides you through the dithering process using a series of audible tones to notify you when the reference values have been obtained. Important: The DIRECTV training materials are the primary source of ODU installation instruction. Those documents supersede the instructions in this manual.
  • Page 45 4 Installing an ODU AIM User’s Manual The table below indicates which tasks need to be performed for each ODU. When an installation includes two ODUs, you must perform the installation tasks for each ODU. The AIM Install feature guides you through the tasks based on the selected ODU.
  • Page 46: Task A. Installation Setup

    (see “ODU Installation Tasks” on page 38). 4 Install the ODU according to the DIRECTV procedure. 5 Connect the AIM’s ODU F Connector to the ODU’s LNB output.
  • Page 47: Task B. Coarse Azimuth Adjustment

    4 Installing an ODU AIM User’s Manual Task B. Coarse Azimuth Adjustment To perform the coarse azimuth adjustment: 1 While monitoring the signal power bar on the COARSE AZ & EL ADJ screen, rotate the ODU on the mast in the azimuth direction until the maximum signal power is reached.
  • Page 48: Task D. Tilt Adjustment (95°, 3-Lnb, Slimline-5, And Slimline-5S (Swim) Odus Only)

    4 Installing an ODU AIM User’s Manual Task D. Tilt Adjustment (95°, 3-LNB, Slimline-5, and Slimline-5S (SWiM) ODUs Only) To perform the tilt adjustment: 1 Loosen the ODU’s tilt lock-down screws. 2 While monitoring the Es/No bar on the TILT ADJ screen, slowly rotate the ODU around the tilt axis until the maximum Es/No value is reached.
  • Page 49 4 Installing an ODU AIM User’s Manual 6 Refer to the ODU’s dial and use the AIM’s numeric keypad to enter the number of turns it took to return to the reference value. Then press OK. 7 Zero out the readout dial on the elevation jack screw. Example: If it took four and a half turns to return to the reference value, enter 4.50.
  • Page 50: Task F. Fine Azimuth Adjustment (Slimline Odus Only)

    4 Installing an ODU AIM User’s Manual Task F. Fine Azimuth Adjustment (Slimline ODUs Only) To perform the fine azimuth adjustment: 1 Loosen the ODU’s azimuth lock-down screws. 2 Turn the ODU’s azimuth jack screw counterclockwise 2 turns. 3 On the FINE AZ ADJ screen, press SET REF to set the reference value. The AIM sounds a confirmation tone and displays the reference value.
  • Page 51 4 Installing an ODU AIM User’s Manual 8 Refer to the AIM screen and turn the azimuth jack screw counterclockwise the number of turns indicated on the AIM screen. 9 Tighten the azimuth lock-down screws. 10 Press OK and then NEXT to continue.
  • Page 52: Performing Eiv Following Odu Installation

    4 Installing an ODU AIM User’s Manual Performing EIV Following ODU Installation When you complete the alignment process for the ODU, the EIV AT ODU screen appears. You can: immediately perform Extended Installation Verification (EIV) on the ODU that you just aligned. Follow the steps below. if the installation includes two ODUs, you can press NEXT to return to the SELECT ODU screen and align the other ODU.
  • Page 53 If X appears again for one or more orbital slots, you can press EIV DETAIL to determine which tests failed. Troubleshoot any failures following the instructions provided by DIRECTV. c To repeat the alignment process, press REPEAT ALIGN. 3 When you have finished reviewing EIV results on the EIV AT ODU RESULTS screen, you can press DONE to return to the HOME screen.
  • Page 54: Performing Eiv

    Performing EIV Extended Installation Verification (EIV) can be performed at any point in the installation to quickly confirm that the installation is satisfactory for all supported orbital slots. EIV is an easy way to pinpoint any potential problems with the installation.
  • Page 55 5 Performing EIV AIM User’s Manual If the installation includes two ODUs, the SELECT ODU screen appears. to highlight the ODU for which you want to perform EIV and press SELECT to go to the EIV screen. 6 On the EIV screen, press RUN EIV and wait briefly for the results. Note: To add a note about the EIV, such as details about where the EIV is being performed, press NOTES.
  • Page 56 If X appears again for one or more orbital slots, you can press EIV DETAIL to determine which tests failed. Troubleshoot any failures following the instructions provided by DIRECTV. Note: To change the location where you are testing, press CHANGE LOC.
  • Page 57: Performing Other Network Tests

    Performing Other Network Tests If there is a problem with a DIRECTV installation, you can run network tests to help you troubleshoot the problem. These tests include: In-line test (see page 51) Satellite Tune test (see page 53) SWiM LF Power test (see page 57) Cable Resistance test (see page 59)
  • Page 58: Performing An In-Line Test

    6 Performing Other Network Tests AIM User’s Manual Performing an In-Line Test You can use the AIM’s In-line test feature to help determine the cause of a problem in an installation. Connecting the AIM in series with the equipment, you can progressively test each segment of the connection between the ODU and the IRD to locate a problem.
  • Page 59 – Indication as to whether DiSEqC commands are being received by the multiswitch (MSW) and BBC. 9 Troubleshoot any problems following the instructions provided by DIRECTV. Note: As messages are received from the 10 Press DONE to return to the TEST screen.
  • Page 60: Performing A Satellite Tune Test

    AIM User’s Manual Performing a Satellite Tune Test You can use the AIM’s Satellite Tune feature to tune to any DIRECTV transponder. Connecting the AIM in different locations in the distribution network, you can progressively test each segment of the connection between the ODU and the IRD to locate a problem.
  • Page 61 6 Performing Other Network Tests AIM User’s Manual 5 Use to highlight the location where you are testing. 6 Connect the AIM ODU F connector at the point in the distribution network where you want to test. Example: To test between the ODU and the multiswitch, disconnect the cable connecting 7 Press SELECT to continue.
  • Page 62 6 Performing Other Network Tests AIM User’s Manual 9 Use to highlight the orbital slot to test and press SELECT to continue. Note: You also can use the keypad to enter the orbital slot number. 10 Use to highlight the transponder to test. Then press SELECT and wait briefly for the results of the test.
  • Page 63 – Indication as to whether the transponder signal is above the power lock threshold. 12 Troubleshoot any problems following the instructions provided by DIRECTV. Note: The SAT TUNE RESULTS screen a To repeat the test at a different location, press CHANGE LOC.
  • Page 64: Performing A Swim Lf Power Test

    6 Performing Other Network Tests AIM User’s Manual Performing a SWiM LF Power Test You can use the AIM’s SWiM LF Power test feature to determine whether there is a communications problem between the SWiM and the IRD. To perform this test, disconnect all IRDs in the distribution network, then connect the AIM in place of an IRD.
  • Page 65 6 On the SWiM LF POWER TEST RESULTS screen, review the results of the test. The screen shows whether the SWiM LF power level is sufficient. 7 Troubleshoot any problems following the instructions provided by DIRECTV. To repeat the SWiM LF Power test in case of a failure, press RETRY.
  • Page 66: Performing A Cable Resistance Test

    6 Performing Other Network Tests AIM User’s Manual Performing a Cable Resistance Test You can use the AIM’s Cable Resistance test feature to help determine whether there is a problem with a cable used in the distribution network. To complete this test, you must use the 25 Ω...
  • Page 67 8 On the CABLE RESISTANCE RESULTS screen, review the resistance of the cable in ohms, adjusted for the 25 Ω Cable Test Load. 9 Troubleshoot any problems following the instructions provided by DIRECTV. To repeat the Cable Resistance test, press REPEAT.
  • Page 68: Performing A Transponder Survey

    6 Performing Other Network Tests AIM User’s Manual Performing a Transponder Survey You can use the AIM’s Transponder Survey feature to record the signal power, carrier-to-noise ratio (ES/No), frequency offset, and lock status for all transponders that can be received using the selected equipment. This can help to determine the location of a problem for an installation.
  • Page 69 6 Performing Other Network Tests AIM User’s Manual 5 Use to highlight the location where you are testing. 6 Connect the AIM ODU F connector at the point in the distribution network where you want to test. Example: To test between the ODU and the multiswitch, disconnect the cable connecting the ODU to the multiswitch and connect it to the AIM’s ODU F connector.
  • Page 70 6 Performing Other Network Tests AIM User’s Manual 9 Press RUN TR SURVEY to start the test. The screen indicates each orbital slot and transponder as they are scanned. 10 When the scan test is complete, press VIEW to go to the TRANSPONDER SURVEY RESULTS screen.
  • Page 71 – Current supplied (in milliamps). – ODU used. – SWiM channel used. 12 Troubleshoot any problems following the instructions provided by DIRECTV. To repeat the test at a different location, press CHANGE LOC. 13 Press DONE to return to the TEST screen.
  • Page 72: Managing Records

    Managing Records The AIM stores information for each account, including the setup information for the installation, and the results for each EIV and Transponder Survey. For all accounts, you can: view records (see page 69) delete records (see page 73) transfer records to and from a USB flash drive (see page 75). The AIM can hold up to 100 record files.
  • Page 73: Understanding Records

    7 Managing Records AIM User’s Manual Understanding Records The AIM stores information in different types of records, including: account records (page 66) setup records (page 67) user records (page 67) test records (page 67) data records (page 68). These records are stored in log files and survey files. A log file contains records of all types.
  • Page 74: Setup Records

    7 Managing Records AIM User’s Manual Setup Records A setup record is generated each time the setup information is updated for the account or an EIV or Transponder Survey is performed. This record shows the new setup information (including ODU, switch, and zip code), as well as the time and date when the change was made or the test was performed.
  • Page 75: Data Records

    7 Managing Records AIM User’s Manual Data Records Several data records are generated each time an EIV or Transponder Survey is performed. Data records show the detailed test results for individual transponders and SWiM channels (if applicable). Two examples are shown.
  • Page 76: Viewing Records

    7 Managing Records AIM User’s Manual Viewing Records You can view all records generated for each account number. To view records: 1 Press CONFIG to go to the CONFIGURATION screen. 2 Use to highlight Records and press SELECT to go to the RECORDS MAIN screen.
  • Page 77 7 Managing Records AIM User’s Manual 5 If you selected a log file, use to highlight the record that you want to view and press SELECT. Tip: Use PAGE UP and PAGE DN to scroll quickly through the records. The record you selected appears. (See “Understanding Records” on page 66 more information on record types.) You can press NEXT RECORD or PREV RECORD to go to the next or previous...
  • Page 78 7 Managing Records AIM User’s Manual 6 If you selected a record from a survey file, the VIEW SURVEY INFO screen appears. You can press NEXT to view the data record for the Transponder Survey on the VIEW SURVEY DATA screen. Tip: Use PAGE UP and PAGE DN to scroll quickly through the test results.
  • Page 79 7 Managing Records AIM User’s Manual 7 If you selected a record from an EIV file, the VIEW EIV INFO screen appears. You can press NEXT to view the data records for the EIV on the VIEW SUMMARY EIV DATA screen, VIEW EIV SWiM RESULTS DATA screen (SWiM installations only) and VIEW RAW EIV DATA screen (SWiM installations only).
  • Page 80: Deleting Records

    7 Managing Records AIM User’s Manual 8 To view another record, press DONE to go to the VIEW RECORDS screen and select another record. Deleting Records You can delete a single log file or survey file, or all record files for all accounts. To delete records: 1 Press CONFIG to go to the CONFIGURATION screen.
  • Page 81 7 Managing Records AIM User’s Manual 4 To delete a single record file, use to highlight Single Record File and press SELECT. Go to Step 5. To delete all record files, use to highlight All Records and press SELECT. A message appears to confirm the deletion. Go to Step 6. 5 Use to highlight the log file or survey file that you want to delete and press SELECT.
  • Page 82: Transferring Records

    7 Managing Records AIM User’s Manual Transferring Records You can transfer records from your AIM to a PC using a USB flash drive. You also can transfer records from a USB flash drive to the AIM. You can transfer a single log file or survey file, or all record files for all accounts. To transfer records: 1 Press CONFIG to go to the CONFIGURATION screen.
  • Page 83 7 Managing Records AIM User’s Manual 6 To transfer a single record file, use to highlight Single Record File and press SELECT. Go to Step 7. To transfer all record files, use to highlight All Records and press SELECT. Go to Step 8. 7 Use to highlight the log file or survey file that you want to transfer and press SELECT.
  • Page 84: Updating The Meter

    Updating the Meter You can update your AIM as new features become available. You can update the AIM application, the AIM’s database (which includes reference information used by Tip: To view the current AIM firmware version, the AIM), or both the application and database. press CONFIG to go to the Configuration screen.
  • Page 85 8 Updating the Meter AIM User’s Manual 5 Insert the USB flash drive that contains the firmware upgrade in the appropriate USB connector on the meter. Wait for 15 seconds, then press OK. The firmware update process begins. A message appears when the firmware update is complete.
  • Page 86: Glossary

    Glossary azimuth The angular distance (side to side) from true north along the horizon of an ODU to a selected satellite. B-band Converter A Ka-band RF converter that allows viewing of high definition channels with some IRDs. carrier-to-noise ratio A measure of the received carrier strength (Es/No) relative to the strength of the received noise, which is an indication of the quality of the...
  • Page 87 A Glossary AIM User’s Manual multiswitch Device that splits up the satellite feed without compromising quality to support multiple IRDs. Out-Door Unit Term used to collectively refer to the satellite equipment, including the satellite dish, that is placed outside a building. orbital slots The location of geostationary satellites around the globe.
  • Page 88: Index

    Index Numerics 95 PORT CONNECTION screen backlight BACKLIGHT TIMER screen battery ACCOUNT NUMBER screen charging replacing buttons saving power Cable Test Load BRIGHTNESS screen carrying case buttons display overview display settings using entering Standby mode F connectors features CABLE RESISTANCE RESULTS screen power adapters Cable Resistance test power-saving features...
  • Page 89 AIM User’s Manual charging the meter’s battery entering checking the current firmware version account number COARSE AZ & EL ADJ screen notes for a job COMPANY screen ODU type for a job CONFIGURATION screen registration information switch type for a job CONTRAST screen Standby mode zip code for a job...
  • Page 90 AIM User’s Manual jobs performing entering notes Cable Resistance test entering the account number coarse azimuth adjustment entering the ODU type coarse elevation adjustment entering the switch type EIV at another location entering the zip code EIV at the ODU fine azimuth adjustment fine elevation adjustment log file...
  • Page 91 AIM User’s Manual safety instructions technical specifications SAT TUNE RESULTS screen technical support SAT TUNE screen TEST screen Satellite Tune test TILT ADJ screen performing tilt adjustment viewing results TIME AND DATE screen saving power time and date, changing SELECT CONFIGURATION screen TIME FORMAT screen SELECT ODU screen TIME screen...
  • Page 92 AIM User’s Manual VERIFY AZ & EL ADJ screen VIEW EIV INFO screen VIEW EIV SWiM RESULTS DATA screen VIEW RAW EIV DATA screen VIEW RECORDS screen VIEW SUMMARY EIV DATA screen VIEW SURVEY DATA screen VIEW SURVEY INFO screen viewing Cable Resistance test results EIV results...

Table of Contents