Empire Comfort Systems DVP36FP3 series Owner's Manual page 22

Direct vent zero clearance gas fireplace heater
Hide thumbs Also See for DVP36FP3 series:
Table of Contents

Advertisement

DVVK-4FV DIRECT VEnT TERMInATIon KIT (continued)
10. With the flex vent assembly and the 48" long hard pipe com-
ponents laid out on the floor, begin securing these parts to-
gether. First, apply a generous bead of silicone sealant to the
inside of the 4" diameter flex flue (not the end with the pre-in-
stalled connector), then slide the flex flue over the 4" diameter
hard pipe flue. Be sure to overlap at least 1-1/4". Secure this
connection with a 4" diameter band clamp provided. Be care-
ful not to damage or tear the flex flue when tightening clamp.
11. Repeat the connection process for the outer 7" diameter flex
vent to hard pipe connection. Use silicone sealant at this joint
also, overlap at least 1-1/4", then secure the joint with the 7"
diameter band clamp provided. Be careful not to damage or
tear the flex vent pipe when tightening the clamp.
12. While the venting is still on the floor, assemble the roof jack
components as shown in Figure 30 and pre-install the roof
jack assembly to the hard pipe approximately 18" from the top
end of the hard pipe.
NUT (2)
SCREW (2)
Page 22
PIPE CLAMP
ROOF BRACKET (2)
WING NUT (2)
Figure 30
13. Now the pre-assembled vent system may be carried to the
roof, then lowered through the roof cutout opening (see step
5). Feed the flex vent end down through the roof opening and
firestop/thimble assembly installed in steps 4 through 6.
14. Secure the roof support assembly to the roof sheathing with
at least (4) nails/screws through each support bracket. Check
that the combustible clearances through the roof framing will
maintain at least a 1" clearance from the vent pipe.
15. Determine how high the vent terminal should be located
above the roof line based on the roof pitch information shown
in Figure 31. Adjust the vent system height by loosening the
pre-installed roof support pipe clamp and sliding the vent pipe
up or down as pre-determined, then re-tighten the pipe clamp.
Install a couple of sheet metal screws through the pipe clamp
into the outer hard vent pipe to lock in place.
16. Check to make sure that the bottom end of the flex vent is
long enough to reach the fireplace adapter collars. If too long,
trim off the extra flex vent not needed.
VENT CAP
GAS VENT
ROOF PITCH
Flat to 6/12
6/12 to 7/12
Over 7/12 to 8/12
Over 8/12 to 16/12
Over 16/12 to 21/12
LOWEST
DISCHARGE
OPENING
H
X
12
ROOF PITCH IS X/12
H (Min.) - Minimum height from
roof to lowest discharge opening
H (Min.)
12" (305mm)
15" (381mm)
18" (457mm)
24" (610mm)
36" (914mm)
Figure 31
26930-5-1010

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents