Installation - Empire Comfort Systems DVP36FP3 series Owner's Manual

Direct vent zero clearance gas fireplace heater
Hide thumbs Also See for DVP36FP3 series:
Table of Contents

Advertisement

Framing and Finishing
1. Choose unit location.
2. Frame in fireplace with a header across the top. It is important
to allow for finished face when setting the depth of the frame.
3. Attach fireplace to frame using adjustable frame. Preset depth
to suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).
4. Use (8) 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in drywall strip and then screw
into pre-drilled holes on fireplace side. Measure from face of
fireplace to face of drywall strip to determine final depth.
vent pipe Clearance
Note: Maintain one inch (1") of clearance around vertical vent
pipe. See Figure 9. For horizontal vent, maintain a minimum 1"
clearance to the bottom and sides of the vent, and 3" clearance to
combustibles above the vent pipe. See Figure 11.
Top of Vent
(76 mm)
3"
(25 mm)
1"
Page 12

INSTALLATION

Combustibles NOT
allowed in shaded
area
4" Diameter flue
7" Diameter
intake vent
1"
(25 mm)
Figure 9
Figure 10
VENT PIPE
1" MINIMUM CLEARANCE AROUND VENT PIPE
Figure 11
26930-5-1010

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents