Loading Brads - Central Pneumatic 97520 Assembly And Operating Instructions Manual

Air brad finish nailer 16 gauge - 2” contractor series
Table of Contents

Advertisement

5.
Connect the air supply to the tool at the Quick Connector (83). Set the regulator
at the recommended 70 to 120 operating PSI. Do not exceed the maximum
120 PSI.
6.
Test the tool by depressing the Safety (50A) against the workpiece without
pulling the Trigger (36). The tool must not cycle (fire). If it cycles (fires), stop
immediately and have it repaired by a qualified service technician.
7.
Hold the tool away or off the workpiece. The Safety (50A) of the tool should
return to its original position. Squeeze the Trigger (36). The tool should not
cycle (fire). If the tool cycles (fires), stop immediately and have it repaired by a
qualified service technician.
8.
Depress the Safety (50A) against the workpiece and squeeze the Trigger (36).
The tool must cycle (fire) only once. Release the Trigger and squeeze it
again. The tool must not cycle (fire). With the Trigger held, carefully lift
the Nailer and press it against the workpiece again. The tool must not cycle
(fire). If it fails to perform in the manner explained in bold, have it repaired by a
qualified service technician.
WARNING: Always wear ANSI approved impact safety goggles when
reloading or performing any other maintenance on this tool. Other
people in the work area must also wear ANSI approved impact safety
goggles.
1.
Slide the Pusher (63) back until it locks in place.
2.
Place a full clip of the desired size Brads (3/4" to 2") in the Magazine Assembly
(70). Up to 100 Brads may be loaded in the Magazine.
For technical questions, please call 1-800-444-3353
SKU 94481

LOADING BRADS

Magazine
Assembly (70)
Pusher (63)
REV 08g
PAGE 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

94481

Table of Contents