Download Print this page

American Standard Ceramix 2000.10X Installation Instructions Manual page 3

American standard centerset lavatory faucet installation instructions

Advertisement

7
ATTACH CABLE CONNECTOR
Thread CABLE CONNECTOR (1) clockwise
onto DRAIN BODY CONNECTION (2) and
hand tighten. Fig. A.
Your new POP-UP DRAIN installation is
now complete. Fig. B.
Note: Tailpeice on pop-up drain is 1-1/4" O.D.
Fig. B.
8
CHECK OPERATION OF POP-UP
Operate LIFT KNOB (1) to verify that STOPPER (2) opens and
closes.
Note: If STOPPER (2) does not open and close properly then
refer to the "troubleshooting section" of these instructions.
9
MAKE WATER SUPPLY AND WASTE CONNECTIONS
Connect FLEXIBLE SUPPLIES (1, 2) directly to wall supplies.
Connection on fitting supplies are 3/8" compression. Connect
left SUPPLY (1) to Hot (Marked with a Red Band) and right supply
to COLD (2) wall supply.
Faucet supplies are 20" long from faucet base.
Note: If additional supply length is required, installer must
purchase additional parts separately.
Important: If SUPPLY HOSES (1, 2) are to long, loop as
illustrated to avoid kinking.
Connect 1-1/4" O.D. tailpiece on POP-UP DRAIN to
waste outlet.
Fig. A.
1
2
APPROX. 20"
1
3
Fig. B.
1-1/4" O.D.
2
2
BLUE
RED
BAND
BAND
3/8" COMPRESSION
HOT
COLD
M 9 6 8 7 6 0 R e v . 1 . 3  
1

Advertisement

loading

This manual is also suitable for:

Ceramix 2000.16xReliant 3 7385 seriesSeva 1480 series