Download Print this page

GE GTUN275GM1WW Installation Instructions Manual page 11

Unitized gas washer/dryer

Advertisement

Available languages

Available languages

Installation
Instructions
I_]MOBILE OR MANUFACTURED HOME
INSTALLATION
• Installation MUST conform to the MANUFACTURED
HOME CONSTRUCTION& SAFETYSTANDARD,
TITLE 24, PART32-80 or, when such standard is not
applicable, with AMERICAN NATIONAL STANDARD FOR
MOBILE HOME, ANSI/NFPA NO. 501B.
• The appliance MUST be vented to the outdoors with
the termination securely fastened to the mobile home
structure.
• The vent MUSTNOT be terminated beneath a mobile or
manufactured home.
• The vent duct material MUST BE METAL.
• KIT14-D346-33MUSTbe usedto attach the appliance
securelyto the structure.
• Thevent MUSTNOTbe connectedto any other duct, vent, or
chimney.
• Do not use sheet metal screws or other fastening
devices which extend into the interior of the exhaust
vent.
• Providean opening with a free area of at least 25 sq. in.for
introduction of outside air into the dryer room.
ALCOVE OR CLOSET INSTALLATION
J_
• If your appliance is approved for installation in an
alcove or closet, it will be stated on a label on the
appliance back.
• The dryer MUSTbe vented to the outdoors.Seethe EXHAUST
INFORMATION section.
• Do not install this appliance with less than the minimum
clearances shown above.
• The closetshould be vented to the outdoors to prevent gas
pocketingin case of a gas leak in the supply line.
• No other fuel-burning applianceshall be installed in the same
closetwith the appliance.
CONSIDERATION
MUST BE GIVEN TO PROVIDE
ADEQUATE
CLEARANCES
FOR INSTALLATION
AND SERVICE.
WARNING:
DO NOT INSTALL
THIS
APPLIANCE
IN A CLOSET WITH A SOLID DOOR.
DOOR VENTILATION
OPENING (27"
MODELS)
A minimum of 120 square inches of opening, equally
divided at top and bottom, is required. Air openings are
required to be unobstructed when a door is installed.
A Iouvered door with equivalent air openings for the
full length of the door is acceptable.
27" Hodel
Sq. In.
When louvers or registers are placed in door openings, the
free air openings of the louvers or registers must equal 120
square inches.
DOOR VENTILATION
OPENING (24"
MODELS)
A minimum of 72 square inches of opening is required. Air
openings are required to be unobstructed when a door is
installed. A Iouvered door with equivalent air openings for
the full length of the door is acceptable.
24" Hodel
Sq. In.
/iI" "H
When louvers or registers ore placed in door openings, the
free air openings of the louvers or registers must equal 72
square inches.
F_]BATHROOM OR BEDROOM INSTALLATION
• The appliance MUST be vented to the outdoors. See
EXHAUSTINFORMATION section 6 & 7.
• The installation must conform with local codes or, in the
absence of local codes, with the NATIONAL ELECTRICAL
CODE, ANSI/NFPA NO. 70 and NATIONAL FUEL GASCODE,
ANSIZ223..
11

Advertisement

loading

This manual is also suitable for:

Gtun275gm0wwGtup240gm5wwGtup270gm4ww