Leak Test; Pilot Adjustment (If Necessary) - Lopi Cypress Owner's Manual

Table of Contents

Advertisement

22
Steps for Finalizing the Installation
1.
Remove the glass (see page 24).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs, driftwood, or stone
set.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3.
Make sure the accent light works correctly.
NOTE: Take care to not touch the bulb with your fingers – use a cloth or paper towel).
4.
Install the four AA batteries (included in the owner's pack) into battery holder (see the illustration below). The AA
batteries act as a power backup in case the household (AC) power goes out. Install the 9v battery (included in
the owner's pack) into control panel light assembly (see the illustration below). The battery holder is held in place
with Velcro and may be removed for easier access.
Swing the control
cover down to
access the batteries.
5.
Install the media (logs, driftwood, or stone set - see page 26).
6.
Replace the glass.
7.
Start the heater.
8.
Leak test all gas joints.
© Travis Industries
Installation
(for qualified installers only)
Battery Holder for
Control Panel Lights
4101110
AA
Battery
Holder
AA Battery Tray
100-01262_000