Nordyne E2 Series Owner's Manual & Installation Instructions page 11

Downflow, upflow electric furnaces air conditioner/heat pump air handler
Hide thumbs Also See for E2 Series:
Table of Contents

Advertisement

Floor
Opening
Refrigerant
Line
Opening
Plenum
Refrigerant
Line
Opening
Preparing Floor Opening(s)
1.
Mark floor opening(s) as shown in Figure
6. Provide minimum clearances at rear and
right side walls of closet or alcove for instal-
lation of furnace and wiring.
2.
Cut floor opening on outside edge of marked
line so that opening is slightly larger than
area marked.
3.
Additional provisions may be necessary for
optional air conditioning or heat pump if
refrigerant lines are installed elsewhere
than at the front of the furnace.
4.
The refrigerant and entrance supply open-
ing dimensions may be adjusted ± 1/2".
Mounting
Plate
Cut-out Area
Supply Air Duct
Cut Duct Opening
1/16th. Larger Than
Plenum Connector
Figure 7. Rear Mounting Plate
Secure Plenum Connector &
Mtg Plate With 2 Flat Head Screws
or Nails At Dimpled Locations
Mounting
Plate
Bend Connector Tabs
Under Duct Opening
Supply Air Duct
Figure 8. Plenum Connector
Rear Wall
Rear Wall
Installing Plenum Connector
NOTE: The plenum connector is designed for
use on ducts down to 12" wide. On typical ducts,
the plenum connector may be installed using
Method A. On narrow ducts, there may be
insufficient clearance to bend the tabs on two
sides of the plenum connector. In such cases,
use Method B or C.
Method A
1.
Place plenum connector through floor opening
with bottom tabs resting on top of supply air
duct. Mark cutout area around inside of tabs.
2.
Remove plenum connector and cut out duct
opening slightly larger than area marked.
Optional Supply
Entrance
11

Advertisement

Table of Contents
loading

Table of Contents