Thermo Pride CHX3-75N Installation And Operation Manual page 40

Two stage condensing gas furnace
Table of Contents

Advertisement

All installations and services must be performed by qualified service personnel.
4. BLOWER AND CONTROL PANEL WIRING
: TURN OFF THE ELECTRICAL POWER to the furnace before attempting to
disconnect blower wiring.
Figure 21
Table 4B
S7 DIP Switch
Switch Settings
S7-1
Thermostat
Off
Type and
On
W2 Delay
Off
On
S7-3
Off
Heat Fan
Off
Off Delay
On
On
* Factory Setting / 2 Stage Thermostat setting
Options
S7-2
Time
Off
Off *
Off
10 Min
On
Auto
On
20 Min
S7-4
Time
Off
90 Sec
On
120 Sec *
Off
150 Sec
On
180 Sec
34

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cdx3-75nChx3-100nCdx3-125nCdx3-100nChx3-125n

Table of Contents