Download Print this page

Installation Procedure - GBC Velobind System One User Manual

All-in-one punch and bind system

Advertisement

3.1
Unpacking Instructions
To unpack the machine, carefully remove the staples and open the carton. Remove
the packing material from the top and around the machine, and lift the machine
straight up out of the carton. Place the machine on a table near a 120 VAC or 220-
240 VAC grounded outlet, and remove the plastic bag.
3.2
Power Cord Configuration
This machine is supplied with a power cord terminating in a conventional three
prong electrical plug. Under no circumstances should the grounding prong of the
power cord be removed to facilitate connection to a non-approved outlet.
3.3
Checking Machine Operation
The handle should operate with relative ease. Leave it in the "up" or starting
position after testing several times.
With the handle in the starting position, check the pressure
be easily lowered and raised by the operator. Leave it in the "up" position after
testing several times.
The machine is now ready to operate. Instruct operator in proper punching and
binding procedures. Point out the operating instructions found in the waste tray,
and leave the owner's guide for the customer. Be sure to stress the importance of
the document being properly placed on the locating pin for binding.

3.0 INSTALLATION PROCEDURE

3-1
bar to ensure it can

Advertisement

loading