Continued
from
Page 5
15
Install glass
panel.
IMPORTANT:
Hold glass in
place while
installing retainer
strips.
Secure with
retaining strips.
16
Predrill the five hole locations.
Secure with screws.
Drill 3/32"
5
Qty.
Pilot Holes
"Mounting Frame Screw Bag"
unpainted
#6 x 1" Pan Head
Cut shipping strap.
17
Remove "Do not cut" label.
Horizontal
Retainer
Strip
Install
Both
Top
and
Bottom
Right
Hinge
Illustrated
Install horizontal strips
first (top then bottom)
Install Both
Left and
Vertical
Right
Retainer
Strip
Left Hinge
Illustration
Continued on Page 7
6