Pella V981553 Installation Instructions Manual

Sliding patio door

Advertisement

Quick Links

Vinyl Windows and Doors
Manufactured by Pella Corporation
INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION
FOR SLIDING PATIO DOOR
Lea las instrucciones en español en el reverso.
Installation Instructions for Typical Wood Frame Construction.
These instructions were developed and tested for use with typical wood frame wall construction in
a wall system designed to manage water. These instructions are not to be used with any other
construction method. Installation instructions for use with other construction methods or multiple
units may be obtained from Pella Corporation or local Pella retailer. Building designs, construction
methods, building materials, and site conditions unique to your project may require an installation
method different from these instructions and additional care. Determining the appropriate installation
method is the responsibility of you, your architect, or construction professional.
Handling and Storage: Provide full support under the framework while storing, moving and installing
the product. DO NOT lift the product by the head member only. Remove the plastic shipping material
prior to storing or installing the product. DO NOT store in direct sunlight. Allow sufficient spacing
between products for ventilation.
YOU WILL NEED TO SUPPLY:
• Cedar or Impervious shims/spacers (12 to 20)
• 2" galvanized roofing nails (1/4 to 1/2 lb.)
• Closed cell foam backer rod/sealant backer (12 to 30 ft.)
®
• Pella
SmartFlash
foil backed butyl window and
door flashing tape or equivalent
• High quality exterior grade polyurethane or
silicone sealant (2 to 3 tubes per door)
• Great Stuff
Window and Door Insulating Foam Sealant by the
Dow Chemical Company or equivalent low pressure polyurethane
window and door foam - DO NOT use high pressure or latex foams.
• Wood blocking for sill
• Optional stainless steel screws and anchors for installation on
concrete floor.
For High Performance Applications:
• #8 x 1-1/2" corrosion resistant Phillips pan head screws (75 to 100)
• #8 x 3/4" outside diameter corrosion resistant flat washers (75 to 100)
REMEMBER TO USE APPROPRIATE
PERSONAL PROTECTIVE EQUIPMENT.
Always read the Vinyl Window and Door Limited Warranty before purchasing
or installing Vinyl Windows and Doors manufactured by Pella Corporation. By
installing this product, you are acknowledging that this Limited Warranty is part of the terms of the
sale. Failure to comply with all Pella installation and maintenance instructions may void your Pella
product warranty. See Limited Warranty for complete details at http://warranty.pella.com.
Installation will require two or more persons for safety reasons.
Part Number: V981553
©2009 Pella Corporation
TOOLS REQUIRED:
• Tape measure
• 2' or 4' Level
• Square
• Hammer
• Stapler
• Sealant gun
• Scissors or utility knife
• Screwdrivers (#2 Phillips with
8" shaft and small flat blade)
• Drill

Advertisement

Table of Contents
loading

Summary of Contents for Pella V981553

  • Page 1 Limited Warranty is part of the terms of the sale. Failure to comply with all Pella installation and maintenance instructions may void your Pella product warranty. See Limited Warranty for complete details at http://warranty.pella.com.
  • Page 2: Rough Opening Preparation

    ROUGH OPENING PREPARATION A. Verify the opening is plumb and level. Ensure the bottom of the rough opening does not slope toward the interior. Note: It is critical that the bottom is level. B. Verify the door will fit the opening. Measure all four sides of the opening to make sure it is 1/2"...
  • Page 3: Prepare The Door For Installation

    PREPARE THE DOOR FOR INSTALLATION TWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL SAFELY. I n t e r i o r V i e w A. Remove the packaging from the door. Inspect the frame and sash for damage.
  • Page 4: Integrating The Door To The Water Resistive Barrier

    C. Fasten the door to opening: Note: Pre-drilling the additional holes in the fin at the interlocker will make installation easier and will help prevent damage to the fin. Use a 3/16" drill bit to pre-drill the holes. Standard Installation: Beginning in the first hole from the fin corner, drive 2"...
  • Page 5: Reinstall The Sliding Panel

    REINSTALL THE SLIDING PANEL TWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL SAFELY. A. Insert door panel. From the interior of the building, tilt the top of the panel toward the door frame and insert the top of the door panel into the top track. Move the bottom of the panel toward the door frame until it is vertical.
  • Page 6: Interior Seal

    I. Install screen by inserting the top of the screen into the screen pocket located at the exterior head of the patio door. Compress the top rollers just enough to allow the bottom of the screen to be inserted onto the bottom screen track. Adjust the screen rollers by turning the adjustment screw located at the top and bottom until the screen operates smoothly and is plumb and centered from top to bottom.
  • Page 7 A. Insert closed cell foam backer rod into the space around the door approximately 1/2". This should provide at least a 1/2" clearance between the backer rod and the exterior face of the door. Note: Backer rod adds shape and depth for the sealant line.
  • Page 8 G. Rotate the handle 180° and install the door handle by inserting the two backplate screws through the door panel and into the exterior handle. Note: Rotating the handle will result in "Pella" script being upside down. A new handle must be ordered for "Pella" to be in correct orientation.
  • Page 9: Cleaning Instructions

    Pella products in accordance with Pella's installation instructions; or the use of Pella products in wall systems which do not allow for proper management of moisture within the wall systems. The determination of the suitability of all building components, including the use of Pella products, as well as the design and installation of allow for proper management of moisture within the wall systems.

Table of Contents