INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION
350 SERIES O,OX/XO SLIDINg PATIO DOOR
WITh fIXED PANEL INSTALLED
Lea las instrucciones en español en el reverso.

Table Of Contents

Installation Instruction Information ...........................................................................................Page-1
Exploded View of Installation and Parts List ............................................................................Page-2
Step 1: Rough Opening Preparation ........................................................................................Page-3
Step 3: Setting and Fastening the Door ..................................................................................Page-4
Step 2: Prepare the Door for Installation .................................................................................Page-4
Step 4: Reinstall the Sliding Panel ............................................................................................Page-7
Step 5: Integrating the Door to the Water Resistive Barrier .................................................Page-8
Step 6: Interior Seal ....................................................................................................................Page-8
Step 7: Sealing the Door to the Exterior Wall Cladding .......................................................Page-9
Step 8: Flush Flange Opening Preparation .......................................................................... Page-11
Step 10: Optional Sill Pan Fabrication and Installation ....................................................... Page-15
Cleaning Instructions and Important Notice Preparation ................................................... Page-16
Installation Instructions for Typical Wood frame Construction and Concrete Block
Constructions.
These instructions were developed and tested for use with typical wood frame wall and concrete
block constructions in a wall system designed to manage water. Installation details specific to
replacement of Aluminum Sliding Doors in Hard Coat Stucco applications can be found at the end
of this instruction. These instructions are not to be used with any other construction method.
Installation instructions for use with other construction methods or multiple units may be obtained
from Pella Corporation or local Pella retailer. Building designs, construction methods, building
materials, and site conditions unique to your project may require an installation method different
from these instructions and additional care. Determining the appropriate installation method is the
responsibility of you, your architect, or construction professional.
The performance of any building is dependent upon the design, installation, and
workmanship of the entire building system. Pella Corporation strongly recommends consulting
an experienced architect, contractor, or structural engineer prior to installation of Pella products.
The individual (building owner, architect, contractor, installer and/or consumer) responsible for the
project must take into account local conditions, building codes, inherent component limitations,
the effects of aging and weathering on building components, and other design issues relevant
to each project. The determination of the suitability of all building components for each project,
as well as the design and installation of flashing and sealing systems, are the responsibility of the
building owner, architect, contractor, installer and/or consumer
Handling and Storage: Provide full support under the framework while storing, moving and
installing the product. DO NOT lift the product by the head member only. Remove the plastic
shipping material prior to storing or installing the product. DO NOT store in direct sunlight. Allow
sufficient spacing between products for ventilation
V983492
Page-1
Part Number: V983492
© 2010 Pella Corporation

Advertisement

Table of Contents
loading

Summary of Contents for Pella V983492

  • Page 1: Table Of Contents

    The performance of any building is dependent upon the design, installation, and workmanship of the entire building system. Pella Corporation strongly recommends consulting an experienced architect, contractor, or structural engineer prior to installation of Pella products. The individual (building owner, architect, contractor, installer and/or consumer) responsible for the...
  • Page 2 Limited Warranty is part of the terms of the sale. Failure to comply with all Pella installation and maintenance instructions may void your Pella product warranty. See Limited Warranty for complete details at http://warranty.pella.com.
  • Page 3: Step 1: Rough Opening Preparation

    ROUGH OPENING PREPARATION If replacing an Aluminum sliding door in hardcoat stucco, see Step 8 flush flange Opening Preparation on page 11. I n t e r i o A. Confirm the opening is plumb and level. Ensure the bottom of the rough opening does not slope toward the interior.
  • Page 4: Step 3: Setting And Fastening The Door

    ROUGH OPENING PREPARATION (CONTINUED) 1 " G. Apply sill flashing tape #2. Cut a piece of flashing tape 12" longer than the opening width. Apply at the bottom, overlapping tape #1 by at least 1". DO NOT allow the tape to extend past the interior face of the framing (1G).
  • Page 5 SETTING AND FASTENING THE DOOR (CONTINUED) B. Dry fit the door. Make sure the door is plumb, square and level. Drill anchor locations with 1/8" masonry bit. Mark the interior of the door frame at the sill to show a boundary for sealant placement.
  • Page 6 SETTING AND FASTENING THE DOOR (CONTINUED) F. fasten the door to the opening: Door frames with Nail fin Only: Insert one 2" galvanized roofing nail into every other pre-punched hole in the nailing fin. All frame Types: Transom/Sidelight: Remove the sill track and pocket covers by pulling on the paper ring.
  • Page 7: Step 4: Reinstall The Sliding Panel

    SETTING AND FASTENING THE DOOR (CONTINUED) 2-PANEL (OX) EXTERIOR J. Install jamb pocket cover in pocket above bumper. Fixed Panel 2-PANEL (XO) EXTERIOR POCKET COVER POCKET COVER INTERIOR LOCK KEEPER K. Install the lock keeper/strike. Position the keeper/ Vent strike at the pre-drilled pilot holes. Insert a shim between Panel the frame jamb and rough opening at the keeper/strike location.
  • Page 8: Step 5: Integrating The Door To The Water Resistive Barrier

    INTEGRATING THE DOOR TO THE WATER RESISTIVE BARRIER A. Apply the side flashing tape. Cut two pieces of flashing E x t e r i o tape 4" longer than the frame height of the door. Apply one piece to each side over the nailing fin and onto the water resistive barrier.
  • Page 9 INTERIOR SEAL (CONTINUED) B. On the interior, seal the door sill to the floor with a corner bead of sealant. Connect this bead of sealant to the insulating foam at both door jambs. C. Check the door operation by opening and closing the door. Note: If the door does not operate correctly, check to make sure it is still plumb, level, square and the sides are not bowed.
  • Page 10: Step 7: Sealing The Door To The Exterior Wall Cladding

    SEALING THE DOOR TO THE EXTERIOR WALL CLADDING (CONTINUED) NAIL-fIN fRAME AND REPLACEMENT fRAME: A. Insert closed cell foam backer rod into the space around the door approximately 1/2". This should provide at least a 1/2" clearance between the backer rod and the exterior face of the door.
  • Page 11 Determining the appropriate installation method is the responsibility of you, your architect, or construction professional. If you have questions, please contact your local Pella retailer. A. Prepare the door opening by removing the venting panel and the glass from the existing fixed side of the aluminum door frame.
  • Page 12 FLUSH FLANGE OPENING PREPARTATION (CONTINUED) H. Install the wood blocking in the head existing door frame. Place a 3/16" bead of sealant in the door panel cavities, then insert the wood blocking into the head cavities. Next insert the wood blocking into the jamb panel cavities of the existing door frame. I.
  • Page 13: Step 9: Setting And Fastening The Door In Flush Flange Applications

    FLUSH FLANGE OPENING PREPARTATION (CONTINUED) O. Using a pencil, mark the interior and exterior Sealant Placement, arrows indicate edges of the sill pan on the sill of the rough sealant locations. opening. Remove the door and sill pan. P. Place a 1/4" diameter bead of sealant in the following locations: - The exterior side of the interior pencil mark.
  • Page 14 SETTINg AND fASTENINg ThE DOOR IN fLUSh fLANgE APPLICATIONS (CONTINUED) B. Place a 1/4" diameter continuous bead of sealant on the face of the existing door frame jambs and head. C. from the exterior, set the door into the opening. Set the sill of the door onto the sill pan and tilt the door into position, centering it in the opening.
  • Page 15: Step 10: Optional Sill Pan Fabrication And Installation

    SETTINg AND fASTENINg ThE DOOR IN fLUSh fLANgE APPLICATIONS (CONTINUED) G. Plumb and square the door. Insert shims between the new door frame and the existing door frame at the pre-drilled anchor hole locations in the door jambs. DO NOT ShIM ThE hEAD UNTIL ALL fIXED PANELS ARE INSTALLED.
  • Page 16 Pella® products in accordance with Pella installation instructions; or the use of Pella products in wall systems which do not allow for proper management of moisture within the wall systems. The determination of the suitability of...

This manual is also suitable for:

350 series

Table of Contents