M6 Nylon - Weider Pro 2000 User Manual

Uk manual
Hide thumbs Also See for Pro 2000:
Table of Contents

Advertisement

10. Insert the post on the Left Arm (7) through the
hole in the Press Frame (5). Make sure the
Arm is behind the indicated bracket on the
Press Frame.
Slide a 25mm Washer (29) over the post on the
Left Arm (7). Attach an M6 x 43mm Bolt (61) to
the post with an M6 Nylon Locknut (72). Make
sure the Nylon Locknut and the head of the
Bolt are over the edge of the Washer, as
shown in the inset drawing.
Press a 25mm Round Outer Cap (27) onto the
post on the Left Arm (7).
Repeat this step with the Right Arm (6).
CABLE ASSEMBLY
11. See the CABLE DIAGRAM on page 19 for
proper cable routing.
Locate the High Cable (50). Route the thread-
ed shaft end of the Cable up through the Top
Frame (4) and over a 90mm Pulley (34). Attach
the Pulley inside the Top Frame with an M10 x
65mm Bolt (55), two M10 Washers (70), two
Small Spacers (37), and an M10 Nylon Locknut
(68).
12. Route the High Cable (50) over a 90mm Pulley
(34) and down through the Top Frame (4).
Attach the Pulley and a Cable Trap (36) to the
bracket on the Top Frame with an M10 x 52mm
Bolt (52) and an M10 Nylon Locknut (68). Make
sure the Cable Trap is oriented to hold the
Cable in the groove of the Pulley.
13. Route the High Cable (50) under a 90mm
Pulley (34). Attach the Pulley, a Cable Trap
(36), and two Finger Guards (35) to the second
set of holes from the top of the two Pulley
Plates (44) with an M10 x 52mm Bolt (52) and
an M10 Nylon Locknut (68). Make sure that
the Cable Trap is oriented to hold the Cable
in the groove of the Pulley.
10
6
5
Bracket
Post
61
72
29
11
55
37
70
12
50
13
52
44
10
27
29
72
7
61
50
4
34
37
70
68
34
36
4
68
52
35
50
35
36
68
34
44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Weevsy2026.0

Table of Contents