Reebok R 5.10 Elliptical Manual page 7

English manual
Hide thumbs Also See for R 5.10 Elliptical:
Table of Contents

Advertisement

2. Orient the Front Stabilizer (3) so that the welded
tubes are facing away from the Main Frame (1).
While a second person lifts the front of the Main
Frame (1), attach the Front Stabilizer (3) with
two M10 x 95mm Screws (100).
3. Identify and orient the Upright (5) and the Top
Cover (27) as shown.
Slide the Top Cover (27) upward onto the
Upright (5).
Then, have a second person hold the Upright (5)
and the Top Cover (27) near the Main Frame (1)
until step 4.
Locate the wire tie in the Upright (5). Tie the
lower end of the wire tie to the Main Wire (60).
Next, pull the upper end of the wire tie until the
Main Wire is routed completely through the
Upright.
Tip: To prevent the Main Wire (60) from fall-
ing into the Upright (5), secure the Main Wire
with the wire tie.
2
3
Wire Tie
60
7
Welded
Tubes
3
1
5
27
Wire Tie
1
100

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R 5.10Rbel15911.0

Table of Contents