6.5.7. R
EMOVING THE
1. Unplug the electrical connection "B5" (F
2. Remove the U-clip "B6" (F
3. Remove the slide plate "B7" (F
4. Unscew the screw "B8" under the boiler (F
5. Remove the U-clip "B9" of the pressure gauge (F
6. Remove the pump (F
IG
F
. 6.72
IG
F
. 6.73
IG
B7
F
. 6.74
IG
46
P
(
S
27 RFFI)
UMP
ECO
YSTEM
. 6.72);
IG
. 6.73);
IG
. 6.74);
IG
. 6.75);
IG
. 6.77).
B5
B6
. 6.76);
IG
F
. 6.75
IG
F
. 6.76
IG
F
. 6.77
IG
B8
B9