NEC Express5800 320Fd-MR User Manual page 172

Hide thumbs Also See for Express5800 320Fd-MR:
Table of Contents

Advertisement

5-42 Installing and Using Utilities
Procedure in the ft server utility
Perform the procedure below before replacement of a component.
1.
Select the target component by using the ft server utility.
2.
Check the current state of the target component with the LEDs and event log.
3.
Click the [Clear] button in [MTBF Clear] of the target component.
The MTBF clearing result can be verified by the LEDs on the target component. The
result of the MTBF clearing operation is registered in the syslog.
4.
Start the component.
Sample screen of ft server utility
[PCI Module]

Advertisement

Table of Contents
loading

Table of Contents