GBC 930-028 Operating And Maintenance Manual page 33

Gbc welder - multiple operator welder user manual
Table of Contents

Advertisement

F-60+ Operation and Maintenance Manual
Product:____________________
Speed: 0-6 fpm (0-180 cpm)
Roll Pressure: Trial
Cooling: Off
NOTE
Use footswitch to load, then accelerate materials through rolls.
Release Liner
(Peel prior to nip)
OPTIONAL
Board can be fed
through
the
pull
rolls using reverse
mode.
© GBC Pro-Tech 1999 April
Process: Cold Mount & Laminate (Second Pass)
FRONT CONTROL SETTINGS
Cold Mount and Laminate (Second Pass)
Foam
Core
Reverse/Forward: Forward
Top Heater: 32-105 °F (0-40 °C)
Bottom Heater: 32 °F (0 °C)
Hold
Encapsulated
Image
Operation
Date:________________
3-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro-tech f-60+Pro-tech f-60+ ce

Table of Contents