Heat & Glo LCOR-HVB-IPI Owner's Manual page 29

Hide thumbs Also See for LCOR-HVB-IPI:
Table of Contents

Advertisement

2. Continue Adding Vent Components
Refer to Cinch Pipe and Termination Cap installation in-
structions.
• Continue adding vent components, locking each succeed-
ing component into place.
• Ensure that each succeeding vent component is secure-
ly fitted and locked into the preceding component in the
vent system. Securing pipe sections with a maximum of
two screws is recommended.
• 90° elbows may be installed and rotated to any point
around the preceding component's vertical axis. If an el-
bow does not end up in a locked position with the pre-
ceding component, attach with a minimum of two (2)
sheet metal screws.
3. Install Support Brackets
Refer to Cinch Pipe and Termination Cap installation in-
structions.
4. Install Firestops
For Horizontal Runs - Firestops are REQUIRED on both
sides of a combustible wall through which the vent passes.
NOTE: Model DVP-TRAP does not need an exterior
firestop on an exterior combustible wall. The firestop is
built into the cap.
To install firestops for horizontal runs that pass through either
interior or exterior walls:
• Cut a 10" x 12" (254mm X 305mm) hole through the wall.
NOTE: The center of the hole is one (1) inch (25.4mm)
above the center of the horizontal vent pipe.
• Position the firestops on both sides of the hole previ-
ously cut and secure the firestops with nails or screws.
• The heat shields of the firestops MUST BE placed to-
wards the top of the hole.
• Continue the vent run through the firestops.
NOTE: There must be NO INSULATION or other
combustibles inside the framed firestop opening.
INTERIOR
WALL SHIELD
Figure 23. 10" x 12" Hole and Vent Pipe
For Vertical Runs - One ceiling firestop is REQUIRED at
the hole in each ceiling through which the vent passes.
To install firestops for vertical runs that pass through ceilings:
• Position a plumb bob directly over the center of the verti-
• Mark the ceiling to establish the centerpoint of the vent.
• Drill a hole or drive a nail through this centerpoint.
• Check the floor above for any obstructions, such as wir-
• Reposition the fireplace and vent system, if necessary,
• Cut an 10-inch X 10-inch (254mm x 254mm) hole through
• Frame the hole with framing lumber the same size as the
10"
12"
29
HEAT SHIELD
INTERIOR
FIRESTOP
Figure 24. Heat Shield, Interior & Exterior Firestops
cal vent component.
ing or plumbing runs.
to accommodate the ceiling joists and/or obstructions.
the ceiling, using the centerpoint previously marked.
ceiling joists.
10" (254mm)
NEW
FRAMING
MEMBERS
CEILING
Figure 25 Hole & New Framing Members
TRIM HEAT
SHIELD IF TOO
LONG, ADD TO
SHIELD IF TOO
SHORT
EXTERIOR
FIRESTOP
10" (254mm)
CHIMNEY
HOLE
EXISTING CEILING
JOISTS

Advertisement

Table of Contents
loading

This manual is also suitable for:

St-hvb-ipiRcor-hvb-ipiPier-hvb-ipi

Table of Contents