Installation Preparation; Electrical Requirements - GE Advantium PSB1200 Installation Instructions Manual

120v built-ln speedcook ovens
Hide thumbs Also See for Advantium PSB1200:
Table of Contents

Advertisement

Installation Preparation
ELECTRICAL REQUIREMENTS
Single Advantium
120 Installation:
This product requires a 120-volt,
60 Hz, 1S-amp circuit
and draws 1.8 kilowatts. This product
must be
connected
to a supply circuit of the proper voltage
and frequency.
• Wire size must conform
to the requirements
of the
National Electrical Code or the prevailing
local code
for this kilowatt
rating.
• The power supply cord and plug should be brought
to a separate
15 or 20 ampere branch circuit single
grounded
receptacle. The outlet box should be
located within reach of the 48" power cord.
ELECTRICAL LOCATION
11
Locate outlet box in the shaded area
t
9"
Install a recessed electrical outlet in the back wall
of the opening within 6" of either side and at least
9" above the cutout floor.
IMPORTANT: (Please read carefullg).
The power cord of this appliance
is equipped with
a three-prong
(grounding) plug that mates with
a standard
three-prong
grounding
wall receptacle
to minimize the possibility
of electric shock. The
customer should have the wall receptacle
and
circuit checked by a qualified electrician
to make
sure the receptacle
is properlg grounded and has
the correct polaritg.
• Where a standard two-prong
wall receptacle
is
encountered,
it is the personal responsibility
and
obligation
of the consumer
to have it replaced with
a properly
grounded
three-prong
wall receptacle.
Do not, under ang circumstances,
cut or remove
the third (ground) prong from the power cord.
DO NOT USE AN EXTENSION CORD.
4

Advertisement

Table of Contents
loading

Table of Contents