Figure 4.3 Power-On Operation Sequence - Fujitsu MJA2500BH - Mobile 500 GB Hard Drive Product/Maintenance Manual

Maintenance manual
Table of Contents

Advertisement

Power-on
a)
SATA I/F Initialization
b)
Self-diagnosis 1
- MPU bus test
- Internal register
write/read test
- Work RAM write/read
test
The spindle motor starts.
Self-diagnosis 2
c)
- Data buffer write/read
test
Confirming spindle motor
d)
speed
Load the head assembly
C141-E293
Start

Figure 4.3 Power-on operation sequence

4.4 Power-on Sequence
e)
Initial on-track and read
out of system information
f)
Drive ready state
(command waiting state)
g)
Execute self-calibration
End
4-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mja2400bhMja2320bhMja2250bhMja2160bhMja2120bhMja2080bh

Table of Contents