Dell Force10 C150 Manual page 32

Installing and maintaining the c150 system
Hide thumbs Also See for Force10 C150:
Table of Contents

Advertisement

Step
Task (continued)
Connect the -48 VDC and Return cables from each PEM to the remote power sources.
8
Verify that the remote power source is in the OFF position.
Locate the appropriate studs on the PEM front panel.
• The two right-handed studs (furthest from the GND) are the return (+48V DC) connection. The cable
attached to these studs is typically red.
• The two left-handed studs (closest to GND) are the -48 V DC connection. The cable attached to these studs
is typically black.
NOTE:
3/4-inch spacing.
Apply a coat of anti-oxidant paste to the connector studs, if required.
Replace the washers and nuts on the studs.
Route the terminated cables out toward the rack rail.
Cables will route down toward the floor. You can then route them as best suits your environment.
Secure the nuts with a nut driver or torque wrench (not to exceed 4 ft/lbs).
Figure 8-3. Grounding
Step
Task (continued)
Replace the safety cover and tighten the captive screw.
9
Note that the safety cover can be rotated to accommodate system configurations.
Turn the Over-Current Protector to the ON position
10
Turn the remote power source (the circuit breaker panel) to the ON position.
11
32
|
Installing DC Power Entry Modules
Power cables must be terminated only with a UL-listed 2-hole lug to accommodate 1/4-inch studs with
Ground
Connector
Return (+48V)
-48V Connectors
Connectors
(Figure
8-1).