Clearance Requirements For Heat Recovery - Trane CenTraVac Installation - General Information

Water cooled centravac with ch530
Table of Contents

Advertisement

Figure 3. Clearance requirements for heat recovery units
Notes:
1. Does not include water box.
2. Minimum vertical clearance over chiller is 3 feet.
3. Minimum work space clearance per national and local electrical codes.
Table with Figure 3
DIM
SHELL
EVSZ
COMB
032S/L
(Inch)
A1
All
10'-6-5/8"
A2
All
11'-8"
B
All
2'-10"
S/S
11'-9"
C
S/L, M/L, L/L
15'-6"
E/L
N/A
S/S
26'-5"
D
S/L, M/L, L/L 33'-11-1 /4" 10343
E/L
N/A
A1 = Without Unit Mounted Starter
A2 = With Unit Mounted Starter
12
General Information
Top View
CVHE, F, G Cooling and Auxiliary Units (Clearance)
EVSZ
050S/L
[mm]
(Inch)
[mm]
(Inch)
3216 11'-2-3/4" 3422
12'-5-3/8" 3794
3555 12'-6-5/8" 3825
13'-1-3/4" 4006 15'-5-1/4" 4705 15'-11-3/4" 4870
864
2'-11-1 /8" 893
2'-6-1 /2"
3581
11'-9"
3581
11'-9"
4724
15'-6"
4724
15'-6"
N/A
N/A
N/A
8052 26'-6-3/8" 8087
27'-4-1/4" 8338
34'
10363 34'-10-1 /2" 10630 35'-5-1 /4" 10801 35'-5-1 /4" 10801
N/A
N/A
N/A
Notes:
1. EVSZ = Evaporator Size, L = Long Shell; S = Short Shell; E = Extended Shell
2. Clearance requirement to evaporator tube removal does not include water box. Add water box dimension in this figure.
3. Does not include water box. Add water box dimension to this figure.
EVSZ
EVSZ
080S/L
142M/L/E
[mm]
(Inch)
[mm]
14'-10"
4521 15'-8-1/2" 4788
775
3'-3-5/8" 1006 3'-10-1 /4" 1174
3581
N/A
N/A
4724
15'-6"
4724
N/A
N/A
17'-5"
5309
N/A
N/A
N/A
N/A
39'-3"
11963
Do not install piping or conduit above compressor
motor assembly or behind suction elbow.
EVSZ
EVSZ
210L
(Inch)
[mm]
(Inch)
N/A
N/A
N/A
N/A
N/A
N/A
15'-6"
4724
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
CVHE-SVN01C-EN
250E
[mm]
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A