Pre-Start Checkout
Table 60. Operational heater summary
Heater Group
VSD Blanket
Pump VSD Enclosure
(optional)
Proper Water Treatment!
The use of untreated or improperly treated water may result in scaling, erosion, corrosion, algae
or slime. It is recommended that the services of a qualified water treatment specialist be
engaged to determine what water treatment, if any, is required. Trane assumes no responsibility
for equipment failures which result from untreated or improperly treated water, or saline or
brackish water.
Hazardous Voltage!
Disconnect all electric power, including remote disconnects before servicing. Follow proper
lockout/tagout procedures to ensure the power can not be inadvertently energized. Failure to
disconnect power before servicing could result in death or serious injury.
142
Thermostat
Designation
1S2
5S4
Fill the evaporator chilled water circuit. Vent the system while it is being filled. Open the vents
on the top of the evaporator during filling and close when filling is completed.
CAUTION
Close the fused-disconnect switch(es) that supplies power to the chilled water pump starter.
WARNING
Start the chilled water pump to begin circulation of the water. Inspect all piping for leakage and
make any necessary repairs.
With water circulating through the system, adjust water flow and check water pressure drop
through the evaporator.
Prove all Interlock and Interconnecting Wiring Interlock and External.
Check and set, as required, all CH530 Menu Items.
Stop the chilled water pump.
Jumper Terminals
Heater Description
Blanket, 1A36
1X4-1 to 1X4-25
Blanket, 1A37
5X4-1 to Wire 632
Pump VSD Enclosure
Heater
Designation(s)
1E1, 1E2
1E3
5E9
CG-SVX17D-EN