Further details regarding the individual steps
Closing the Vitoair draught stabiliser
1. Switch ON the burner.
Opening the boiler door and the clean−out cover
4x
Note
Remove the gas supply pipe on gas
burners.
Initial start−up, inspection and maintenance
(if installed)
2. Switch OFF the system, when
pre−purge is running; this closes
the control disc.
(cont.)
9