Initial start−up, inspection and maintenance
Steps initial start−up, inspection and maintenance
For further instructions on individual steps, see pages indicated.
C
M
C
M
M
I
M
M
M
M
I
M
M
M
M
M
M
M
M
I
M
I
M
M
I
M
I
M
4
Commissioning steps
Inspection steps
Maintenance steps
1. Adjusting pressure regulator and pressure limiter
4. Closing the Vitoair draught stabiliser (if installed)
7. Cleaning heating surface, flue outlet and flue pipe
8. Checking all seals/gaskets and packing cords
on flue gas side
9. Checking thermal insulation of boiler door
15. Checking all connections at the water and
steam sides, the sensor well and the
inspection ports for leaks after filling the boiler
20. Checking the safety and control equipment
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . .
. . . . .
. . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . .
. . . .
. . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . .
. . . . . . . . . . . . . . . . . . . .