Testing And Adjustments; Adjustments; Lighting - Sunfire SDG-1 Installation And Operation Manual

Gas convection ovens
Hide thumbs Also See for SDG-1:
Table of Contents

Advertisement

TESTING AND ADJUSTMENTS

Adjustments

NOTE: Each oven has been factory tested and adjusted prior
to shipment. It may be necessary to further adjust the oven
as part of a proper installation. Such adjustments are the
responsibility of the installer.
Adjustments are not considered defects in material and
workmanship, and they are not covered under the original
equipment warranty.

Lighting

1. Turn on main gas valve. Drop the combustion chamber
front cover and the control panel. Leak test all fittings and
connections upstream from the service valve. Should any
gas leaks be detected, turn OFF main gas valve, correct
the problem and retest.
2. Open shutoff valve located at the front right. Activate
control panel and set to desired temperature. The pilot
burner is now ignited by direct spark. Check all fittings
again. Correct any leaks and recheck.
Part # 1844030 (03/19/10)
NOTE: All electronic ignition systems are supplied with a
redundant gas valve. Therefore, the unit is not supplied with
an external pressure regulator.
NOTE: During installation there will be air in the gas line, this
air will have to bleed off before ignition can be established.
The electronic ignition system has a fifty second lock-out as
a safety device on all units manufactured for PROPANE only.
Therefore, several attempts may be required before pilot
ignition is established, wait five minutes after each attempt.
FOR YOUR SAFETY: KEEP YOUR APPLIANCE ARE FREE FROM
COMBUSTIBLES.
To Conserve Energy:
Do not waste energy by leaving controls at high temperature
settings during idle periods. Lower settings will keep oven
warm and ready for next use period. Reset controls as
required for heavy load period.
Page 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sdg-2

Table of Contents