Heatilator NDV3630 Owner's Manual page 46

Installation and operation
Hide thumbs Also See for NDV3630:
Table of Contents

Advertisement

Install Horizontal Termination Cap
WARNING! Risk of Fire! The telescoping fl ue section of
the termination cap MUST be used when connecting vent.
1-1/2 (38 mm) minimum overlap of fl ue telescoping
section is required.
Failure to maintain overlap may cause overheating and
fi re.
Vent termination must not be recessed in the wall. Siding
may be brought to the edge of the cap base.
Flash and seal as appropriate for siding material at
outside edges of cap.
Cap Specifi cation Chart (depth without using additional pipe sections)
DVP-TRAPK1
Top Vent Depth
4 1/2 to 6 3/8 in.
NDV Series
DVP-HPC1
Top Vent Depth
4 1/2 to 6 5/8 in.
DVP-TRAP1 can adjust 1 1/2 in. (3 1/8 to 4 5/8)
DVP-TRAP2 can adjust 4 in. (5 3/8 to 9 3/8)
SLP-TRAP1 can adjust 1 5/8 in. (3 1/8 to 4 3/4)
SLP-TRAP2 can adjust 4 in. (5 1/4 to 9 1/4))
DVP-HPC1 can adjust 2 1/8 in. (4 1/4 to 6 3/8)
DVP-HPC2 can adjust 4 1/8 in. (6 3/8 to 10 1/2)
46
Note: When using termination caps with factory-supplied heat shield
attached, no additional wall shield fi restop is required on the exterior side
of a combustible wall.
Wall Shield
Firestop
Inner Vent
Outer Vent
Vent depth from back of appliance to
outside surface of exterior wall
(see chart below)
Figure 10.20 Venting through the wall
DVP-TRAP1
Rear Vent Depth
3 to 4 7/8 in.
DVP-HPC1
Rear Vent Depth
3 to 5 1/8 in.
Heatilator • Novus NDV Series • 4055-187 Rev. X • 6/13
When installing a horizontal termination cap, follow
the cap location guidelines as prescribed by current
ANSI Z223.1 and CAN/CGA-B149 installation codes
and refer to Section 6 of this manual.
CAUTION! Risk of Burns! Local codes may require
installation of a cap shield to prevent anything or anyone
from touching the hot cap.
NOTICE: For certain exposures which require superior
resistance to wind-driven rain penetration, a fl ashing kit and
HRC caps are available. When penetrating a brick wall, a
brick extension kit is available for framing the brick.
Heat Shield or
Extended
1-1/2 in. (38 mm) min.
Heat Shield
Slip Section
can be extended
SHEATHING
INTERIOR
DVP-TRAPK2
DVP-TRAP2
Top Vent Depth
Rear Vent Depth
6 7/8 to 10 7/8 in.
5 3/8 to 9 3/8 in.
DVP-HPC2
DVP-HPC2
Top Vent Depth
Rear Vent Depth
6 5/8 to 10 3/4 in.
5 1/8 to 9 1/4 in.
Heat Shield
overlap
EXTERIOR
SLP-TRAP1
Top Vent Depth
Top Vent Depth
2 to 3 7/8 in.
4 3/8 to 8 3/8 in.
SLP-TRAP2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents