PEERLESS LC SERIES Installation, Operation & Maintenance Manual page 42

Oil, gas & gas/oil boilers-steam
Table of Contents

Advertisement

i
6
4
9
1
2
16;
f
e
7
FRONT
15
10
8
14
11;<
REAR
1
2
3
4
5
6
7
16
4" NPT Supply Tapping, Front Section
8
4" NPT Supply Tapping, Rear Section
9
3" NPT Return Tapping, Rear Section
10
Not Used On Steam,
11
1/2" NPT Tapping - Plug
12
(2) 1/2" NPT Gauge Glass or
13
LWCO Tapping
Tankless Coil Temp Control Tapping,
3/4" NPT, Only with Tankless Coil Installed
14
Relief Valve and Skim Tapping, 21/2 " NPT
15
Not Used On Steam, 3/4" NPT - Plug
Pressure Ctrl/Gauge
Assembly,
3/4" NPT Tapping
Secondary Probe LWCO Tapping, 3/4" NPT
Not Used On Steam,
1" NPT Tapping - Plug
Drain Tapping, 3/4" NPT
NOt Shown - 1" NPT Tapping in Side and
Top of First Intermediate
- for LWCO
Not Used On Steam,
(2) 3/4" NPT Tapping - Plug
Tankless Coil Temp Control Tapping, 3/4" NPT, Only with Optional Tankless Coil Back Section
Figure 29:
Control
and Pipe Tapping
Locations
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents