Clearance From Combustible Construction; Combustion And Ventilation Air; Chimney Or Vent; Motorized Vent Damper Interlock - PEERLESS LC SERIES Installation, Operation & Maintenance Manual

Oil, gas & gas/oil boilers-steam
Table of Contents

Advertisement

h
oN [*.]-'liLVJlk_l:i'4[a):] L vJq_l
Provide the following minimum
clearances to
combustible
construction• See Figure i.
.,i
[I,{.]_VJl:{l_"_l/[e]_._l f ±lL'_llp]ivJ::lL_b/llV___l/[O]l._l
V'_II;
2,
3.
4,
I
Sides: 6"
2. Rear of Jacket: 6"
3. Front of Jacket: 24**
4. Top of Jacket: 24"
5. Steam and Hot Water Pipes: 6"
6. Vent or Chimney Connector:
18"
The installation must provide adequate
air for
combustion
and ventilation.
Unless the boiler room construction
and natural air
infiltration are sure to provide all the air needed,
provide an opening or duct to the outside with a free
cross sectional area of at least I square inch per
4000 Btuh input for all installed appliances.
At high
altitude, increase this requirement
4% for each i000
feet above sea level.
The boiler room must never be under negative
pressure. If exhaust fans or other equipment
can
cause a negative pressure in the boiler room, the air
openings and equipment
design must be engineered
to assure a neutral or slightly positive pressure in the
boiler room at all times of operation.
If the
equipment
design and air openings cannot assure
this, then the boiler must be located in an isolated
rOOM.
Using combustion air dampers:
a) If motorized dampers
are used on the
combustion
and ventilation air openings, wire
them such that they must open when the boiler
tries to operate• They must include a switch
which prevents the boiler from operating
if they
do not open. See Figure 2.
I.
2
3.
4.
5.
6.
7.
Inspect the existing chimney or vent system
Make
sure it is in good condition• Inspect chimney liner
and repair or replace if necessary•
The vent system and installation must be in
accordance
with the current edition of the American
National Standard
ANSI/NFPA 21 i, "Chimneys,
Fireplaces, Vents, and Solid Fuel Burning
Appliances",
or applicable provisions of the local
building codes. The venting requirements
for the
LCE are the same as for the LC. Figure 3 shows the
top flue outlet required on LCE boilers
Chimney/Vent
Operation:
The vent system must be
sized and installed to remove all combustion
products.
If the vent system is not sized properly, the
burner may not operate properly. This can cause
poor combustion
or sooting to occur.
If the vent terminates
in an area where wind-
generated
downdrafts
are likely, install a suitable vent
cap which can control wind effects.
This boiler is designed
to fire only with a pressurized
fire box. The breeching and vent may be sized for
negative,
neutral or positive pressure (no more than
0.I inches water column at the boiler outlet) as
desired. But negative pressure overfire can cause
lifting of the flame and poor combustion
or
overheating
of the boiler crown sheet•
Forced draft breechings and vents must be sealed
and of heavy gauge steel construction and must
comply with all applicable codes of construction.
The vent diameter and minimum
height for stub
vents are listed in the Ratings and Dimensions
Section of this manual.
Always extend vent
terminations
at least 3 feet above the roof line. See
Figure 3.
Failure to provide adequate venting can result in
severe property damage, personal injury or death.
I
Burner Wired to Open Damper
i_
on Call for Heat
Ed Sdw/_ c V-ht C-phrovesD amper Open
Then Allows Burner to Start
Motorized Combustion
Air Damper, Typical
Burner
Figure
2:
Motorized
Vent Dumper
Interlock
Figure
3:
Vent
Termination,
Typical

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents