Assembly - Craftsman 113.177370 Owner's Manual

16 gallon full blowing wet/dry vac
Table of Contents

Advertisement

Vac Assembly
1. Line up vacuum port in power assembly
with drain cap located on the front of
the drum.
2. Place power assembly on top of drum
with the handles snug against the drum
channel.
3. Be sure power assembly completely
covers the top of the drum so leakage
does not occur.
4. Push down on top of the handles to
cause the flexible locking tabs to hook
onto the drum lip of the channel.
5. Make sure that the locking tabs are
snapped in place to prevent the power
assembly from coming off. (See inset
below)
Drum
t\_
Channel_----__
Handle _
Tab
_
Drum
Power Assembly
Push
Down
Pull
Out
Flexible
Locking
Ta_)ab
Do Not Force Flexible
Tab Beyond Stop Tab
Flexible Locking
Tabs

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents