Download Print this page

Craftsman 358.794771 Operator's Manual page 6

25cc/1.5 cu.in. 2-cycle 215 mph/470 cfm gasoline powered blower/vac

Advertisement

Available languages

Available languages

A
411 WARNING:
If you receive
your
unit assembled,
repeat all steps to en-
sure your unit is properly assembled
and all fasteners
are secure.
A standard screwdriver
is required
for assembly.
BLOWER
ASSEMBLY
BLOWER
TUBE ASSEMBLY
If you have already assembled
your
unit for use as a vacuum,
remove the
vacuum
tubes and collection
bag.
1. Align the rib on the upper blower
tube with the groove in the blower
outlet; slide the tube into place.
NOTE: Knob must be loose enough
to
allow blower tube to be inserted in
blower outlet. Loosen knob by turning
counterclockwise.
__
Blower Outlet
2= Secure the tube by turning the
knob clockwise.
3= Align the slots on the lower blower
tube with the tabs on the upper
blower tube.
6. To remove the tubes, turn the knob
counterclockwise
to loosen the
tubes; remove the tubes.
HIGH-SPEED
NOZZLE
ASSEMBLY
When greater air speed is desired, use
the high-speed
nozzle.
1. Align the slots on the nozzle with
the tabs on the lower blower tube.
High-Speed
Nozzle
Lower Blower
Tube
2. Slide the nozzle onto the lower
blower tube.
3.
Turn the nozzle clockwise
until a
click is felt to secure the nozzle to
the lower blower tube.
VACUUM
ASSEMBLY
VACUUM
BAG ASSEMBLY
1. Open the zipper on the vacuum
bag and insert the elbow tube.
2. Push the small end of the elbow
tube through the small opening in
the bag.
Elbow Tube
Rib
4.
Slide the lower blower tube onto
the upper blower tube.
5= Turn the lower blower tube clock-
wise until a click is felt to secure
the lower blower tube to the upper
blower tube.
NOTE: When the upper and lower
blower tubes are assembled
together
properly, the arrows on both tubes will
be aligned.
Opening
Small Opening
NOTE: Make sure edge of the small
opening is flush against the flared area
of the elbow tube, and the rib on the
elbow tube is on the bottom.
3.
Close the zipper on the bag. Make
sure the zipper is closed completely.
4.
Remove blower tubes from engine.
5= Insert the elbow tube into the blow-
er outlet. Make sure elbow tube rib
is aligned with the blower outlet
groove.
-6-

Advertisement

loading