6 Checklists for completion prior to installation

Use the following checklists to ensure that:
You have understood the location, power and networking/fibre channel requirements of the
product at the time of placing the order
Prepared the environment and the information that the service specialist requires to install and
configure your system

Location

At the time of placing the order, make sure that there is a suitable location with access to install
the product. This must be a data center environment and not an office environment. (See
specifications (page 6)
1.
The receiving dock, storage area, and receiving area are large enough to allow movement of
and access to crated or packed equipment.
2.
The floors, elevators, and ramps are able to support the weight of the delivered equipment as it
is moved to the installation location.
3.
The installation location must provide:
Sufficient space to accommodate the installed product. This product is provided in extended
racks: an installed depth of 1240mm ( 50.50 inches ) is required.
nl
Note: When installing two racks, the units should be located next to each other, to ensure there
are no problems with cable lengths.
Appropriate power, air conditioning, cabling, and fire protection.
Adequate protection from electrostatic discharge (ESD).
Adequate protection from electrical/radio frequency interference.
Adequate protection from dust, pollution, and particulate contamination
Adequate acoustic insulation for operating the system.

Power/PDU requirements

At the time of placing the order, make sure that the location can support the HP B6000 Series
Backup System's input power and power outlet requirements. The AC power input for the HP B6000
Backup System has a duplex PDU structure, which enables the entire rack to remain powered on
if power is removed from one of the two power distribution panels.
Prior to installation you should confirm that you have specified the correct PDU for your geographical
location and connector type and that you have sufficient power outlets. See
requirements (page
for more details.) It should conform to the following requirements:
7).
Product
Power/PDU
Location
19

Advertisement

Table of Contents
loading

Table of Contents