Regency P36D-NG1 Owners & Installation Manual page 58

Zero clearance direct vent gas fireplace
Hide thumbs Also See for Regency P36D-NG1:
Table of Contents

Advertisement

®
REGENCY
OPTIONS
6) Install Top Support Frame
Slide in the Top Support Frame using the slots as a guide. Secure
and re-tighten the screws to the unit.
View of backside of Top Support Frame.
7) Side Support Frame
a) Mount Side Support Frame to unit as shown in Diagram 6, then
secure with 2 screws on each side.
b) Repeat step on the other side.
58
58
Cut-Outs
Diagram 6
8) Attach Top and Side Support Frame
a) Ensure the Side Supports are aligned with the correspond
hole on the Top Support Frame, then secure with 1 screw.
b) Repeat step on the other side.
Note: The Nailing Strips can be adjusted, depending on the fac
material (as indicated in Diagram 7).
1/2" Facing
Material
1" Facing
Material
Diagram 7
9) Optional
Install Optional 3-Panel Arch Door. (Refer to Install 3-Panel A
Door Instruction Sheet).
10) Change in Logo
Replace existing logo with Regency logo.
®
Regency
P36D-1 Zero Clearance Direct Vent Gas Fireplace

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Regency p36d-lp1P36d-1P36d-ng1P36d-lp1

Table of Contents