General; Introduction; Installation; Unpacking - Vulcan-Hart VCD22* ML-138037 Installation & Operation Manual

Vcd series chip warmers
Table of Contents

Advertisement

VCD SERIES CHIP WARMER

INTRODUCTION

Vulcan-Hart
Chip
produced with quality workmanship and
material. Proper installation, usage, and
maintenance of your warmer will result
in
many
years
performance.
It is suggested that you thoroughly read
this entire manual and carefully follow all
of the instructions provided.
As with any piece of food service
equipment, this Chip Warmer requires a
minimum of care and maintenance.
Recommended
contained in this manual and should
become a regular part of the operation
of the unit.

INSTALLATION

Before installing, verify that the electrical
service agrees with the specifications on
the rating plate located on the lower
back corner of the warmer. If the supply
and equipment requirements do not
agree, do not proceed with unpacking
and installation. Contact your Vulcan-
Hart
Customer
Service
immediately. (Fig. 4)

UNPACKING:

The Warmer was inspected before
leaving the factory. The transportation
company assumes full responsibility for
safe delivery upon acceptance of the
shipment. Immediately after unpacking,
check for possible shipping damage to
the warmer.

GENERAL

Warmers
are
of
satisfactory
procedures
are
Department
If
the
warmer
damaged,
save
material
and contact the
within 15 days of delivery.
Carefully unpack warmer and place in a
work accessible area.
1.
Remove banding holding the
carton to the pallet.
2.
Carefully remove warmer from
carton and place on floor or table.
3.
Remove any and all packaging
materials inside unit.
4.
Peel off all vinyl protection film.
5.
Thoroughly clean the warmer as
described in the cleaning instruct-
ions in this manual.
3
F-38053 (02-13)
is
found
to
be
the
packaging
carrier

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vcd44 ml-138069Vcd22Vcd44Vcd5

Table of Contents