Figure 12: Cabling A System Installed In Static Rails - Dell PowerEdge Metered Manual

Cable routing procedures
Hide thumbs Also See for PowerEdge Metered:
Table of Contents

Advertisement

Cable Routing Procedures for Dell™ PowerEdge™ R310 & R410 Systems
3. Connect all applicable cables to the rear of the system and verify that all connections are
secure.
4. Using the hook and loop straps, bundle the cables and secure them to either the left rail or
right rail as described in the
data cables that are secured to the left rail and power cables that are secured to the right rail
(as viewed from the rear of the system).

Figure 12: Cabling a System Installed in Static Rails

Rack Installation Instructions
. See Figure 12 for an example of
Page 10