Installation Checklist
Using the Checklist
Table A-1
Factory-Integrated Installation Checklist (Continued) (Continued)
PROCEDURE
Install non-factory-integrated
I/O cards (if required)
Select PCI card slot
Install PCI card
Verify installation
Route cables using the cable
management arm
Install other peripherals (if
required)
Perform visual inspection and
complete installation
Set up network services (if
required)
Enable iCOD (if available)
Final inspection of circuit boards
Final inspection of cabling
Area cleaned and debris and
packing materials disposed of
Tools accounted for
Parts and other items
disposed of
Make entry in Gold Book
(recommended)
Customer acceptance and
signoff (if required)
88
IN-PROCESS
COMPLETED
Appendix A