Lighting Instructions - COZY HEDV404 Installation And Operating Instructions Manual

Hi-efficient direct vent wall furnace
Table of Contents

Advertisement

STEP 4.
a)
b)
c)
d)
e)
t)
INSTALLING
HEATER
Screw wall brackets to wall. Location
marked with template.
(See Step la)
Screw trim kit brackets to back of heater.
(See Figure 9).
Slide heater
to within approximately
5" from wall.
Attach air intake hose to collector box outlet and burner box inlet with clamps provided.
(See Figure 10).
Attach vent exhaust tube to exhaust pipe on collector
box and draft inducer outlet on back of heater.
Secure with clamps provided.
(See Figure
10).
GAS CONNECTION.
Make gas connection
between
manual shut offvalve
and furnace valve with
approved
connectors.
Compounds
used on threaded joints of gas piping shall be approved
for use with
L.R gas. The gas lines must be checked for leaks by the installer with soapy water or liquid detergent,
never an open flame. If connections
are not exposed,
a pressure test must be run. Be sure to disconnect
the gas supply line from the appliance
valve before pressure
testing.
The manifold
pressure is pre-set at
the factory and should be 3.5" w.c. for Natural Gas and 10" w.c. for L.R gas. The minimum
inlet
pressure
for Natural Gas is 4.5" w.c. and 11" w.c. for L.R Gas, "for purpose
of input adjustment".
The
maximum
inlet pressure
should never exceed 7.0" w.c. on Natural Gas or 14" w.c. on L.R Gas.
STEP 5. INSTALLING
REAR TRIM KIT
a)
Secure right and left trim kit sides to the wall and trim kit brackets
with eight #8 screws provided.
See
figure 11. The back of the heater should now be spaced 5" from the wall.
b)
Remove the temperature
sensing unit from the back of the heater.
Save the nylon attachment
clip and the
#8 screw.
c)
Slide the temperature
sensing unit through the 1/2" bushing
located on the right trim kit side. Viewed from
the front of the heater.
d)
Secure the temperature
sensing unit to the outside of the right trim kit side using the nylon clip and #8
screw saved ti'om step B. Engagement
hole provided.
e)
Secure trim kit top panel to trim kit sides with tour #8 screws provided.
f)
Plug power supply cord into a 115V grounded electrical
outlet.
g)
Turn the manual gas supply valve to the "on" position.
HEATER
IS NOW
INSTALLED,
FOLLOW
LIGHTING
INSTRUCTIONS.
Trim Kit
(4)
FIGURE
11
Trim Kit
Left Side
Page 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hedv403

Table of Contents