COZY HEDV404 Installation And Operating Instructions Manual page 13

Hi-efficient direct vent wall furnace
Table of Contents

Advertisement

@F0
THERMOSTAT
CALLS FOR
HEAT
SEQUENCE
OF OPERATION
- HEDV403/4
@FX
Th_lmostat
is satisfied
F10
Sec
t 15 sec
F20
sec
F50
sec
FX
sec
tX+15
sec
FX÷120
sec
NO
STEP
l)
2}
3}
4)
5}
6)
7}
8)
#
Thermostat
calls for heat.
Combustion
fan turns on.
Pressure
switch closes.
Power to Ignitor.
Ignitor warm up period.
Gas flow to burner.
Burner ignition proven.
Circulating
blower on.
NOTE:
If there is a mal-
function
in any of the
above steps, the sequence
will stop at that point and
STEP
#
8) Continued...
return to Step 2. If after 3 attempts
malfunction
still occurs, furnace will
go into lockout mode for one hour.
This one hour mode can be bypassed
by resetting
thermostat.
9)
Thermostat
satisfied.
10)
Gas valve closes.
11)
Combustion
fan off.
12)
Blower
off.
HEATER
NOW IN STAND-BY
MODE.
Page 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hedv403

Table of Contents