Installation; Gas Supply - COZY HEDV404 Installation And Operating Instructions Manual

Hi-efficient direct vent wall furnace
Table of Contents

Advertisement

INSTALLATION
Failure to follow these instructions
carefully could result in poor performance_
property
damage, personal
injury_ or
death.
STEP 1. LOCATE
VENT OPENING
(Requires
3-1/2" diameter
wall opening)
a)
Select area on wall where heater will be installed.
Using template
(packed with heater) mark shaded area
b)
c)
d)
e)
where hole can be cut and to locate
the wall brackets.
Locate studs on each side of this area.
Mark location for 3-1/2" diameter
hole between
studs. Hole should
be of[;et to miss studs. (See Figure 6).
Check outside wall at this location for proper clearances
around vent cap.
Cut vent openings
into both the inside and outside walls, being sure to maintain
level across both openings.
I
L_, /"
I I
I
I
I
I
I ..--
Wall
J!Studs
[
16" O.C.
I
Template
t
I7
t t
II
tt
t t
tt
Shaded
Area
I
I
I
FIGURE
6
1/8" N.P.T. Plu_
for Pressure Gauge
Manual Shut
OffValve
I
I
I
Gas Supply
Inlet
(hound Joint
Union
' (761rnn)Min.
FIGURE 7
STEP 2. ROUGH-IN
GAS SUPPLY
(See Figure 7)
a)
Install a 1/2" gas supply line. The gas line will enter the heater from the 5" spacing between the heater
back and the wall.
b)
Install a drip leg in gas supply line immediately
upstream
from the gas connection
to heater, (see local
codes), and provide a 1/8" N.RT. plugged tapping, accessible
for test gauge connection
and a individual
manual shut offvalve.
The furnace and its individual
shut offvalve
must be disconnected
from the gas
supply piping system during any pressure testing of that system at test pressures
in excess of 1/2 psig
(3.5Pa).
The furnace must be isolated from the gas supply piping system by closing its individual
manual
shut off valve during any pressure
testing of the gas supply piping system at test pressures
equal to or less
than 1/2 psig (3.5Pa).
Page 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hedv403

Table of Contents