Craftsman 917.28008 Operator's Manual page 12

26.0 hr 54" mower electricstart automatic transmission
Hide thumbs Also See for 917.28008:
Table of Contents

Advertisement

Available languages

Available languages

t/f CHECKLIST
Before
you operate
your
new
tractor, we
wish to assure
that you receive
the best
performance
and
satisfaction
from
this
Quality
Product.
Please
review the following
checklist:
_/All
assembly
instructions
have
been
completed.
J
No remaining
loose parts in carton.
J'Battery
is properly
prepared
and
charged.
€" Seat is adjusted
comfortably
and tight-
ened securely.
Z' All tires are properly
inflated.
(For ship-
pi ng purposes, the tires were overinflated
at the factory).
vf Be sure mower deck is properly leveled
side-to-sideifront-to-rear
for best cutting
results.
(Tires must be properly
inflated
for leveling).
_/Check
mower and drive belts.
Be sure
they are routed properly
around pulleys
and inside all belt keepers.
vf Check wiring,
See that all connections
are still secure
and wires are properly
clamped.
,/Before
driving tractor, be sure freewheel
control is in "transmission
engaged" posi-
tion (see "To Transport"
in the Operation
section of this manual).
While
learning
how to use your tractor, pay
extra
attention
to the following
important
items:
_/ Engine oit is at proper level.
_,/Fuel
tank is filled with fresh, clean, regular
unleaded
gasoline.
if
Become
familiar
with all controls,
their
location
and function.
Operate
them
before you start the engine,
vz Be sure brake system is in safe operating
condition.
J" Be sure Operator
Presence
System and
Reverse
Operation
System
(ROS) are
working properly
(Seethe Operation
and
Maintenance
sections
in this manual).
/
tt is important
to purge the transmission
before operating
your tractor for the first
time.
Follow proper
starting and trans-
mission
purging
instructions
(See "TO
START ENGINE"
and "PURGE TRANS-
MlSSlON"
in the Operation section of this
manual).
t2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents