Optional Installations And Mode Switch Bank Settings; Required Tools; Removing The Chassis Cover; B.1 Required Tools - Enterasys 2H252-25R Installation & User Manual

Enterasys networks installation user's guide smartswitch 2200 2h252-25r
Hide thumbs Also See for 2H252-25R:
Table of Contents

Advertisement

ELECTRICAL HAZARD: ONLY QUALIFIED SERVICE PERSONNEL SHOULD
ATTEMPT THE FOLLOWING PROCEDURES.
NUR QUALIFIEZIERTE SERVICE PERSONNAL DIE FOLGENDE PROCEDURE
FOLGEN SOLLTEN.
SOLAMENTE PERSONAL CALIFICADO DEBE INTENTAR ESTE PROCEDIMIENTO.
The top cover must be removed to gain access to the mode bank switches, to install optional
FLASH or DRAM Single In-line Memory Modules (SIMMs), or to install an optional High Speed
Interface Module (HSIM) or Very High Speed Interface Module (VHSIM).
This appendix covers the following items:

Required tools

(Section

Removing the chassis cover

Locations, functions, and settings for the mode switches
Installing optional SIMM upgrades
Location of Optional HSIMs
B.1
REQUIRED TOOLS
Use the following tools to perform the procedures provided in this appendix:
Antistatic wrist strap
Phillips screwdriver
Optional Installations and
Mode Switch Bank Settings
B.1)
(Section
B.2)
(Section
(Section
B.5)

Optional Installations and Mode Switch Bank Settings

(Section
B.4)
B.3)
B
B-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartswitch 2200Smartswitch 2200 2h252-25r

Table of Contents