Thermador VCIB36JP Installation Manual page 11

Thermador professional custom insert
Hide thumbs Also See for VCIB36JP:
Table of Contents

Advertisement

Available languages

Available languages

Assembly of the Transition
Figure 2: Transition Dimensions
Figure 3: Transition Cutout
1. A minimum height clearance of 10¼" (260 mm) is
needed above the hood for transition mounting.
2. Remove transition from inside of hood. Discard
brackets attaching transition to the inside of hood.
3. Align mounting holes at base of transition with the
mounting holes of the 1/2" (13 mm) flange located at
the top or rear of the hood.
4. Fasten transition to hood using two (2) 1" (25.4 mm)
sheet metal screws included with hood.
5. Seal connection between transition and hood with
aluminum tape. DO NOT use duct tape.
6. Remove tape holding damper closed.
Figure 4: Transition Centerline
English 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vcin36jpVcin48jpVcin54jpVcib48jpVcib54jp

Table of Contents