Panasonic CF-T4GWCTZ1 Service Manual page 20

Cf-t4
Table of Contents

Advertisement

3.3.
Installation and Line processing of Speaker
Putting of speaker fixation ring
Processing of speaker cable
Putting of speaker box
3.4.
Assembly of Touch Pad
Insertion of PAD FFC
PAD FFC is
inserted in the
PAD FFC
connector.
(Direction where
the reinforcement
version is seen)
Touch Pad
Putting of touch pad
Pin for positioning
The touch pad
is put
Touch Pad
Put according to 4 ribs.
Solder
Match case
2 2.5mm From the rib to the terminal
Black line
Red line
Speaker Cable
The cable is not loosening between the rib and the pin.
Touch the boss
Installation of pad button
Puted in the gasket
ditch
Inserted in the
positioning pin
Pad button
Latch is inserted in the top case(4 places)
Putting of pad cover
3-4
Speaker Fixation Ring
sign to the center in the terminal of the speaker.
The double coating part of
the cable according to the ditch of the case
Putting of speaker box
Touch the Case's wall
Putting of PAD sheet
Sets in the dent
The hooks are hooked
It is confirmed that all
LED lenses fit in the
hole of the pad cover
Pad Cover
The hooks are inserted
This line must
become vertical
PAD sheet
After putting of the
PAD sheet, the
Flaking off paper is
peeled off

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cf-t4gwctz2

Table of Contents