Tubing Replacement; Cleaning Measurement Cell - Hanna Instruments PCA 311 Instruction Manual

Bromine, ph, temperature, orp analyzers
Table of Contents

Advertisement

TUBING REPLACEMENT

Note:

CLEANING MEASUREMENT CELL

The remaining tubing in the analyzers should be replaced
every two months.
HI 70479
When installing new tubing it is helpful to dip them in hot
water before making the connections.
It is also recommended that one tube at a time is removed
and replaced.
DPD reagent tubing may darken before the scheduled replacement
time, but this will not affect the instruments performance.
In order to maintain the maximum reliability of measurements,
it is recommended to periodically clean the measurement cell.
In fact, the measurement cell could collect sediment or
develop a film growth on the inside walls. When the automatic
dirt compensation system detect the deposits presence, the
analyzer will show "Dirty cell" message.
The measurement could continue but cleaning is recommended
to avoid deposits that are harder to clean.
Thorough cleaning with a dilute acid solution and a cotton
swab is recommended monthly. Depending on sample
conditions at individual locations and absence of input filters,
it may be necessary to clean the cell on a weekly basis. This
can be determined by observing the cell condition when
reagents are changed.
It is also highly recommended to clean the cell every time you
turn the meter off. In such a way, scaling and molds growth
are prevented. Otherwise, subsequent cleaning might become
more difficult.
For cleaning procedure, remove the plastic cap placed on the
top of the measuring cell.
Add a few drops of 19.2N Sulfuric Acid solution or alcohol to the cell.
HI 70474 or HI 70475
HI 70473
6 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pca 321Pca 331

Table of Contents