When installing the timing belt to the CR, make 3 - 10 teeth of the belt appear, as
shown in the figure below.
T T
When installing the upper CR guide shaft, ensure that the upper plain oil pad is
installed between the upper CR guide shaft and the CR.
T T
When installing the parallelism adjust bushing, set it with the groove facing up.
Figure 3-28. Parallelism Adjust Bushing Installation
3-22
WORK POINT
Figure 3-27. Timing Belt Installation