Preparing The Brewer For Use - Bunn A10 Installation & Operating Manual

Hide thumbs Also See for A10:
Table of Contents

Advertisement

Raise the hinged flip lid.
Place the decanter on the warmer. Pour two pitchers of water
(filled to the top line) into the screened area on top of the brewer.
Wait two minutes between pitchers to allow the water to fill the
tank. When the tank is full, some water will flow through the
funnel and into the decanter.
Close the lid and plug in the brewer.
Press the top of the vacation switch, located on the
lower left side of the brewer, to the "ON" (I) position.
The vacation switch controls power to the tank heater.
Initially you will have to wait approximately ten minutes
in order for water to reach brew temperature.

PREPARING THE BREWER FOR USE

ALL MODELS
NOTE: THE BREWER IS NOT READY TO PLUG IN
8
P2078
P2079
P-214
P2080.15
43422.1 010311

Advertisement

Table of Contents
loading

This manual is also suitable for:

A10-a

Table of Contents