Bryant 355AAV Installation Instructions Manual page 59

4-way multipoise variable-capacity condensing gas furnace for sizes 040-120, series c
Hide thumbs Also See for 355AAV:
Table of Contents

Advertisement

LOAD CALCULATION
________________
Heating Load (Btuh)
________________
Cooling Load (Btuh)
________________
Furnace Model Selection
COMBUSTION AND VENT PIPING
Termination Location
________________
Roof or Sidewall
________________
Termination Kit --- 2 Pipe or Con-
centric
________________
Combustion--- Air Pipe Length
________________
Combustion--- Air Pipe Elbow
Quantity
________________
Vent Pipe Length
________________
Vent Pipe Elbow Quantity
________________
Pipe Diameter Determined from
Sizing Table
________________
Pipe Sloped To Furnace
Pipe Insulation
________________
Over Ceilings
________________
Low--- Ambient Exposed Pipes
CHECKLIST — DIRECT VENT (2 ---PIPE) INSTALLATION
Condensate Drain
________________
________________
________________
________________
CHECKLIST --- START ---UP
________________
________________
Thermostat Anticipator
________________
________________
Safety Controls Check Operation
CHECKLIST --- START ---UP
________________
________________
Thermostat Anticipator
________________
________________
Safety Controls Check Operation
________________
________________
59
Unit Level or Pitched Forward
Internal Tubing Connections
Free of Kinks and Traps
External Drain Connection Leak
Tight and Sloped
Condensate Trap Primed before
Start--- Up
Heat Tape Installed if Required
Gas Input Rate (Set Within 2
percent of Rating Plate)
Temperature Rise Adjusted
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr)
Selected
Gas Input Rate (Set Within 2
percent of Rating Plate)
Temperature Rise Adjusted
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr)
Selected
Primary Limit
Pressure Switches

Advertisement

Table of Contents
loading

Table of Contents