Bryant 355AAV Installation Instructions Manual page 26

4-way multipoise variable-capacity condensing gas furnace for sizes 040-120, series c
Hide thumbs Also See for 355AAV:
Table of Contents

Advertisement

Table 5 – Maximum Capacity of Pipe*
NOMINAL
INTERNAL
IRON
DIA.
10
PIPE SIZE
IN. (MM)
(3.0)
IN. (MM)
0.622
1/2 (13)
175
(158)
3/4 (19)
0.824 (21)
360
1 (25)
1.049 (27)
680
1-1/4 (32)
1.380 (35)
1400
1-1/2 (38)
1.610 (41)
2100
* Cubic ft. of gas per hr for gas pressures of 0.5 psig (14--- in. wc) or less and
a pressure drop of 0.5--- in wc (based on a 0.60 specific gravity gas). Ref:
Table 9.2 NFGC.
Piping should be pressure and leak tested in accordance with
NFGC in the United States or NSCNGPIC in Canada, local, and
national plumbing and gas codes before the furnace has been
connected. If pressure exceeds 0.5 psig (14- -in. wc), gas supply
pipe must be disconnected from furnace and capped before
pressure test.
If test pressure is equal to or less than 0.5 psig (14- -in. wc), turn off
electric shutoff switch located on gas valve before test. It is
recommended that ground joint union be loosened before pressure
testing. After all connections have been made, purge lines and
check for leakage at furnace prior to placing it into service.
The gas supply pressure shall be within the maximum (13.6- -in.
wc) and and minimum (4.5- -in. wc) inlet supply pressures marked
on the rating plate with the furnace burners ON at HI- -HEAT and
OFF.
FRONT FILLER
PANEL
Fig. 29 - - Removing Bottom Closure Panel
LENGTH OF PIPE --- FT. (M)
20
30
40
50
(6.0)
(9.1)
(12.1)
(15.2)
120
97
82
73
250
200
170
151
465
375
320
285
950
770
660
580
1460
1180
990
900
BOTTOM
CLOSURE
PANEL
A93047
GAS
SUPPLY
MANUAL
SHUTOFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
Fig. 30 - - Typical Gas Pipe Arrangement
Step 8 — Electrical Connections
See Fig. 32 for field wiring diagram showing typical field 115- -v
and 24- -v wiring. Check all factory and field electrical connections
for tightness.
WARNING
!
ELECTRICAL OPERATION HAZARD
Failure to follow this warning could result in personal injury
or death.
Blower access door switch opens 115- -v power to furnace
control. No component operation can occur. Do not bypass or
close switch with panel removed.
CAUTION
!
UNIT MAY NOT OPERATE
Failure to follow this caution may result in intermittent unit
operation.
Furnace control must be grounded for proper operation or
control will lock out. Control is grounded through
green/yellow wire connected to gas valve and burner box
screw.
115- -V WIRING Before proceeding with electrical connections,
make certain that voltage, frequency, and phase correspond to that
specified on furnace rating plate. Also, check to be sure that service
provided
26
A93324

Advertisement

Table of Contents
loading

Table of Contents