GE GTDS850EDWS Installation Instructions Manual page 7

Ge 7.8 cu. ft. capacity electric dryer with stainless steel drum and steam
Hide thumbs Also See for GTDS850EDWS:
Table of Contents

Advertisement

LEVELING AND STABILIZING YOUR DRYER
5
the 4 leveling legs, at the corners, to ensure that the dryer
is level from side to side and front to rear.
4 LEVELING LEGS
Installation Instructions
LEVEL
SIDE-TO-SIDE
LEVEL
FRONT-TO-BACK
OPEN
DOOR 90
O
WARNING
4 LEVELING LEGS
Before the "Alcove or Closet
installation".
such as gasoline, away from dryer.
Explosion Hazard
explosion, or fire.
6
ALCOVE OR CLOSET INSTALLATION
If your dryer is approved for installation in an alcove or closet, it will
be stated on a label on the dryer back.
The dryer MUST be vented to the outdoors. See the EXHAUST
INFORMATION sections 3 & 4.
Minimum clearance between dryer cabinet and adjacent walls or
other surfaces is:
0 in. either side
52 in. from floor to overhead cabinets.
3 in. front
3 in. rear
Consideration must be given to provide adequate clearance for
installation and service
ceiling, etc. is 52 in.
Closet ventilation openings required: 2 louvers each 60 square in.
(387 square cm), located 3 inches (7.6 cm) from top and bottom
of door. If the closet contains both a washer and a dryer, doors
must contain a minimum of 120 sq. in. of open area equally
distributed.
Keep flammable materials and vapors,
Failure to do so can result in death,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents